My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995 015 Ordinance
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
1995 Ordinances
>
1995 015 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 3:59:59 PM
Creation date
8/22/2018 8:16:26 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Ordinance
Number
015
Date
3/27/1995
Year
1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
13=95 MON 4;17 ADMINISTRATION <br />.: <br />Mayfield Village Fire Station <br />March 9, 1995 <br />Page 3 ~ ' <br />FAX K0, 2164610552 <br />P, 05 <br />r~.or subgrades below slabs v d andtproo£-r led dto erify <br />Tnte <br />pavement ox' walks would be obser a constr u red fill <br />that unstable areas and areas disturbeclladC d ng Any req <br />dried and recompacted or removed and rep <br />n lar base materi~.1 would be h kn saes of ftheagra ular <br />and gra u Compacted t <br />project specifications. <br />base material would be measured. led, and <br />Exterior concrete placement WOe eral concreteeplacement and as <br />tested as ment~.oned ,above for g <br />required by the project specifications, <br />as haltic concrete paving, representative areas of newly <br />emp <br />During P erature, com- <br />with the <br />placed asphaltic c yea th~.ckness .beWe wauad fwark fQxSedetermining <br />paction, and compac <br />paving contractor to establish Reps ~~ntativ~ samples of each <br />pavement compaction criteria. <br />attic concrete mix would be m~btbenrequa.redaelivered to our <br />asph testing'whlch Y , <br />laboratory for any erienced <br />Our construction monitoring projects are staffed he tpmerpcan Con- <br />senior level technicians Na °,'onal Iri$ itute for Cer rk 1undern the <br />,crete Institute and The Our field technicians WOfield report, <br />Engineering Technologies.ro,ect"engineer. A daily ro ect <br />direct supervision o£ a P. ~ the p j <br />repared by the field te~a~~ecian and reviewed by <br />P is standard,proc <br />engineer, <br />ort would be available on an as-needed an as- <br />Engineerin9 asisp Engineering supervision and coordination and <br />requested b <br />report review time would be billed at the listed ra es. <br />~~~s <br />dex to develop an• estimate osar hefor sus for a timate tthe <br />Tn or it was neces y <br />monitoring Se1'v'~-ces, hales of the project which woul ~ and <br />durations of the vat Si cepthe project is in the desigtnhe~~gdura~ <br />quire our services. We Suggest <br />the construction schedu or budgetinge Purpdsesl only•+more roject <br />tions should be used f estimate the du~'a- <br />that these estimates be revue a rel minarilyd when p <br />P <br />details ~ become a~railable. <br />tiona listed on the fo7.low~-ng Page ~ 5 days <br />Site Preparation and Earthwork 5 days <br />Foundation Construction 2 days <br />Sackfill and Ynterior Subgrade Preparation l day <br />dolt Torque Testing 1 day <br />Visual Weld lnspeGtion ~ 3 days <br />Floor Slab Concrete <br />
The URL can be used to link to this page
Your browser does not support the video tag.