Laserfiche WebLink
der [his Agreement. will end 30 days arter final <br />• payment to ail Contractors is due. <br />7.2.7 Unless othen.vise provided in this Agreemenc and <br />incorporsted in the Contract Documents. tfie Construc- <br />tion Manager, in coeperation with the Architect, shall <br />provide administra[ion of the Con[racts ror Construction <br />as set forth below and in the 1980 Edition of AIA Doc- <br />ument A201: C.v1. General Conditions of the Contract ror <br />Construction, Construc[ion Ntanagement Edition. <br />1,2.2 Provide adminisirative, management and rela[ed <br />services as required to coordinate bVork oi the Contractors <br />with each other and with the activities and responsioilities <br />of the Conscruction Manager, the Owner and the Archi- <br />tect to complete the Project in accorciance with the Own- <br />er's objectives tor cosr, time and quality. Provide surficient <br />organization, personnel and management to carry out the <br />requirements of this Agreement. <br />1.2.2.7 Schedule and conduct pre-construction, eonstruc- <br />tion and progress meetings to discuss such matters as pro- <br />cedures, progress, problems and scheduling. Prepare and <br />promptly disiribute minutes. <br />1.2.2.2 Consistent with the Project Construction Sched- <br />ule issued with the Bidding Documents, and utilizing the <br />Contractors' Construction Schedules provided by the sepa- <br />rate Contractors, update the Project Construction Sched- <br />ule incorporating the activities of Contractors on the <br />Project, including activity sequences and durations, alio- <br />cation of labor and materials, processing of Shop Draw- <br />ings, Product Data and Samp(es, and delivery of products <br />reguiring long lead time procurement. Include the Own- <br />er'S occupancy requirements showing portions of the <br />Project having occupancy priority. Update and reissue the <br />Project Construction Schedule as"required to show current <br />conditions and revisions required by actual experience. <br />7.2.23 Endeavor to achieve satisfactory performance <br />from each of the Contractors. Recommend courses of <br />action to the Owner when requiremenes of a Contract are <br />not being fulfifled, and the nonperforming party will not <br />take satistactory corrective action. <br />1.2.3 Revise and rerine the approved estimate of Con- <br />struction Cost, incorporace approved changes as they oc- <br />cur, and develop cash flow reports and foretasu as needed. <br />1.2.3.1 Provide regufar moni[oring of the approved esti- <br />mate of Construction Cost, showing actual coscs for activi- <br />ties in progress and estimates for uncompleted [asks. Iden- <br />tify variances between actual and budgeted or estimated <br />costs, and advise the Owner and the Architect whenever <br />projected costs exceed budgets or estimates. <br />1.2.3.2 Maintain cost accounting records on authorized <br />Work performed under unit costs, additiona( Work per- <br />farmed on the basis of actuai costs of labor and materials, <br />or other Work requiring accounting records. <br />1.Z.3.3 Recommend necessary or desirabfe changes to <br />the Architect and the Owner, review requests for changes, <br />assisi in negotiating Contractors' proposals, submit recom- <br />mendations to the Architect and the Owner, and if they <br />are accepted, prepare and sign Change Orders for the <br />Acchitect's signature and the Owner's authorization. <br />7.2,3,4 Deve(op and implemenc procedures for the re- <br />view and processing of Applications by Contracton for <br />progress and final payments. Make recommendations to <br />the Architect for certiiication to the Owner for payment. <br />1.2.4 Review the safet}• pro;rams deveioped by each of <br />the Contractors as required by their Contract Documents <br />and coordinate the sarety programs for the Project. <br />1?a As;isc in obtaining bui(ding permits and special <br />permits for permanent improvements, exciuding permits <br />required ;o be obtained directly by the various Contrac- <br />tors. Veriry that che Owner has paid applicable tees and <br />assessments. Assist in obtaining approvals from authorities <br />having jurisdiction over the Project. <br />1?.6 Ir reGuired. as=ist the Owner in selecting and re- <br />taining the proiessional services of surveyors, special con- <br />sultants and testing laboratories. Coordinate their services. <br />1?.7 Determine in -eneral that the Worlc of each Con- <br />tractor is being perrormed in accordance %vith the require- <br />ments oi the Contract Documents. Endeavor to guarcf the <br />Owner agains[ deiects and dericiencies in the bVork. As <br />appropria[e, require special inspection or tesiing, or make <br />recommendations to the Architect regarding special in- <br />spection or cesting, of Work not in accordance with the <br />provisions of the Contract Documents whether or not <br />such Work be then tabricated, installed or comp(eted. <br />Subject to review by the Architect, reject Worlc which <br />does not conrorm to the requirements of the Contract <br />Oocuments. " <br />7.2.7.1 The Construction Nlanager shall be responsi- <br />ble for construction means, methods, techniques, se- <br />quences and procedures employed by Contractors in the <br />performance of their Concracu, and shall • be responsi- <br />ble for the raifure of anv Contractor to carrv out Work in <br />accordance with the Contract Documents. <br />1.2.8 Consult with the Architect and the Owner ir any <br />Contractor requests interpretations of the meaning and, <br />intent of the Drawings and Specifications, and assist in the <br />resolution of questions which may arise. <br />1.29 Receive Certir?cates of Insurance rrom the Con- <br />tractors, and forvvard them to the Owner with a copy to <br />the Architect. <br />1Z10 Receive from the Contractors and review all Shop <br />Drawings, Product Data. Samples and other submittals. <br />Coordinate them with inrorma4ion contained in related <br />documents and transmii to the Arcfiitect those recom- <br />mended for approva(. In collaboration with tfie Architect, <br />establish and implement procedures for expediting the <br />processing and approvaf of Shop Drawings, Product Data, <br />Samples and other submittafs. <br />1.2.17 Record the progress of the Project. Submit written <br />progress reports to the Owner and the Architect inciuding <br />information on each Contractor and each Contractor's <br />Work, as well as the entire Project, showing percentages <br />of completion and the number and amounts of Change <br />Orders. Keep a daily log coneaining a record of weather, <br />Contractors' Work on che site, number of workers, Work <br />accomp(ished, probiems encountered, artd other sirnifar <br />relevant data as the Owner may require. Make the Iog <br />avaifable to the Owner and the ArchitecL <br />1.2a11.7 Maintain at the Project site, on a current basis: <br />a retord copy of a(( Contracts, Drawings, Speciftcations, <br />Addenda, Change Orders and other Modifications, in good <br />order and marked to record all changes made during con- <br />struction; Shop Drawings; Produci Data; Sampfes; sub- <br />mittals; purchases; materials; equipment; applicable hand- <br />books; maintenance and operating manuals and instruc- <br />AIA OOCUMEIdT Ba07 • OWNER•tONSTRI;CTION MA.+AGER AGREEMENT • JUNE 1980 EDIT10N • AIA19 <br />3 8801 - 1980 Q1980 • THE AMERIUN INSTITUTE OF ARCNITEC75. 1735 NEIV YORK AVE., N.W., WASHINGTON, D.C. 20006