My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006 017 Resolution
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
2006 Resolutions
>
2006 017 Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 4:03:10 PM
Creation date
8/29/2018 5:00:22 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Resolution
Number
017
Date
9/25/2006
Year
2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RESOLUTION NO. 2006-17 <br />PAGE 2 <br />General Engineering Projects -Schedule 1 <br />Airports <br />Bridges and Grade Separation Structures <br />Foundations Dams and Hydraulic Structures Highway and City Streets <br />Street Reconstruction <br />Incinerators <br />Intercepting, Relief, Storm or Sanitary Sewers <br />Outside Electrical Installations Power Plants <br />Pumping Stations <br />Railway and Bus Terminals <br />Electrical Transmission and Distribution Facilities Tunnels and Caissons <br />Ground or Underground Water Storage Facilities <br />Waterfront and Terminal Improvements Water, Sewage <br />and Industrial Treatment Plants Water Intakes and Sewage Outlets <br />Minimum Fees - <br />Schedule 1 Cost of <br />Construction <br />$100,000 or below ................................................................ 12% of actual cost <br />$100,000 to $500,000 Base Fee of ................................... 12% of $100,000 Plus <br />7.5% of amount over <br />$100,000 <br />$500,000 to $1,000,000 ......................................................... Base Fee of 8.4% of the <br />first $500,000 plus 6% of <br />the amount over $500,000 <br />Over $1,000,000 .......................................................................Base Fee of 7.2% of the <br />first $1,000,000 plus 5.8% <br />of amount over <br />$1,000,000 <br />General Engineering Projects -Schedule 2 <br />Street Resurfacing <br />Minor Roads and Streets in Undeveloped Areas <br />Irrigation and Drainage Ditches <br />Landing Fields <br />Levees and Flood Walls Off-Street Parking Lots Retaining Walls <br />Sidewalks <br />Street Lighting Systems <br />Water Distribution Systems and Elevated Storage Tanks Water, <br />Coal, Oil and Gas Transmission Pipelines <br />
The URL can be used to link to this page
Your browser does not support the video tag.