My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006 017 Resolution
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
2006 Resolutions
>
2006 017 Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 4:03:10 PM
Creation date
8/29/2018 5:00:22 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Resolution
Number
017
Date
9/25/2006
Year
2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RESOLUTION NO. 2006-17 <br />PAGE 3 <br />Minimum Fees-Schedule 2 <br />Cost of Construction <br />$100,000 .................................................................................. 9% <br />$100,000 to $500,000 ...................................................................Base fee of 9% of $100,000 <br />Plus 6% of amount over <br />$100,000 <br />$500,000 to $1,000,000 ................................................................Base Fee of 6.6% of <br />$500,000 <br />plus 5% of the amount <br />over $500,0000 <br />Over $1,000,000 ............................................................................Base Fee of 6% of <br />$1,000,0000 <br />Plus 4.9% of amount over <br />$1,000,000 <br />(c) If, after the plans, profiles, specifications and estimates of costs for work <br />authorized and approved by the Council have been prepared by the Engineer, the <br />proceedings for such work is abandoned or is postponed for a period of more than <br />six (6) months, or the actual construction of such work is not commenced within <br />nine (9) months after the date of delivery of said plans, profiles, specifications and <br />estimates of costs, then he shall be paid forthwith a sum equal to seventy-five percent <br />(75%) of the fee stated in Section 3(b), based on the total estimated cost of said <br />improvements, as full compensation fox all work done up to that date upon the <br />subject project. In the event the proceedings for such work so abandoned, ox <br />postponed, is revived and actively pursued by the Village, he shall perform the <br />balance of the services to be rendered under this Agreement and not previously <br />performed, and he shall credit against the total compensation due any payments made <br />under Section 3(c). <br />(d) The fee provided in Section 3(b) hereof shall cover engineering services <br />including preliminary estimates and reports, complete detailed plans and <br />specifications, preparation of monthly and final estimates for contractor payments. <br />The above schedule of fees does not include property, topographic, boundary or <br />right-of-way surveys, lines and grade stakes, resident engineer, inspection of <br />materials, cost of test borings, or other subsurface explorations, or calculation of <br />special assessments. These latter services may be provided by the Engineer on an <br />hourly basis in accordance with the schedule of rates hereinafter set forth in Section <br />3(e). Specialized services shall be done by Sub-consultants and their fees shall be <br />approved by the Village prior to doing the work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.