Laserfiche WebLink
RESOLUTION NO. 2006-17 <br />PAGE 3 <br />Minimum Fees-Schedule 2 <br />Cost of Construction <br />$100,000 .................................................................................. 9% <br />$100,000 to $500,000 ...................................................................Base fee of 9% of $100,000 <br />Plus 6% of amount over <br />$100,000 <br />$500,000 to $1,000,000 ................................................................Base Fee of 6.6% of <br />$500,000 <br />plus 5% of the amount <br />over $500,0000 <br />Over $1,000,000 ............................................................................Base Fee of 6% of <br />$1,000,0000 <br />Plus 4.9% of amount over <br />$1,000,000 <br />(c) If, after the plans, profiles, specifications and estimates of costs for work <br />authorized and approved by the Council have been prepared by the Engineer, the <br />proceedings for such work is abandoned or is postponed for a period of more than <br />six (6) months, or the actual construction of such work is not commenced within <br />nine (9) months after the date of delivery of said plans, profiles, specifications and <br />estimates of costs, then he shall be paid forthwith a sum equal to seventy-five percent <br />(75%) of the fee stated in Section 3(b), based on the total estimated cost of said <br />improvements, as full compensation fox all work done up to that date upon the <br />subject project. In the event the proceedings for such work so abandoned, ox <br />postponed, is revived and actively pursued by the Village, he shall perform the <br />balance of the services to be rendered under this Agreement and not previously <br />performed, and he shall credit against the total compensation due any payments made <br />under Section 3(c). <br />(d) The fee provided in Section 3(b) hereof shall cover engineering services <br />including preliminary estimates and reports, complete detailed plans and <br />specifications, preparation of monthly and final estimates for contractor payments. <br />The above schedule of fees does not include property, topographic, boundary or <br />right-of-way surveys, lines and grade stakes, resident engineer, inspection of <br />materials, cost of test borings, or other subsurface explorations, or calculation of <br />special assessments. These latter services may be provided by the Engineer on an <br />hourly basis in accordance with the schedule of rates hereinafter set forth in Section <br />3(e). Specialized services shall be done by Sub-consultants and their fees shall be <br />approved by the Village prior to doing the work. <br />