My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1991 010 Resolution
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
1991 Resolutions
>
1991 010 Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 4:05:38 PM
Creation date
9/5/2018 7:33:06 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Resolution
Number
010
Date
1/21/1991
Year
1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FROM NOVRNCSEK INC 2.17.1992 10:07 P. 9 <br />SECTION V ~ WASTEW74TER TREAZ'N~2~ 'pLAP1TS <br />A. The COUNTY shall own all wastewater treatment plants within <br />the municipal, limits and obtain all required regulatory agency <br />permits. <br />B. Before construction of any wastewater treatment plant, the <br />plans shall be reviewed and approved by the Village Engineer and the <br />COUNTY. <br />C. The COUNTY agrees to provide the necessary personnel, <br />equipment and material to operate, maintain and repair the wastewater <br />treatment plant facilities. <br />D. The COUNTY shall make all necessary repairs or improvements to <br />the wastewater treatment facilities. <br />E. The COUNTY shall. be r®sponsible for the cast o! expansion d£ <br />County-owned wastewater treatment facilities. <br />F. No work of construction of any wastewater treatment facility <br />shall be done except in the presence of an inspector employed by the <br />~QUNlis <br />G. The COUNTY shall be responsible for acquiring any and all <br />deeds and easements necessary for the construction, maintenance, <br />operation and repair of the wastewater treatment facilities. <br />SECTION VI- STOR~9 SEWERS <br />A. The VILLAGE shall own all storm Sewers within the municipal <br />limits. <br />8. Hefore construction of any storm sewers, the plans shall be <br />reviewed and approved by the Village Engineer and the coUNTY. <br />C. The VILLAGB agrees to provide the necessary personnel, <br />equipment and material for the operation, maintenance arad repair of <br />mualicipally owned storm sewer main lines, lateral connections in the <br />public right of way, ar easements, service connection on pulalic <br />property,~retentian basins, catch basins, catch basin laterals, <br />manholes, culverts, ditches and natural wat®r courses all on public <br />property only. <br />-6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.