Laserfiche WebLink
>7 <br />. 2 <br />r~ <br />Assessment Information Request: <br />1 Essential Building Information: <br />1.01 Building address; facility/maintenance contact; year built; years and <br />descriptions of any major renovations (e.g. all windows were replaced with <br />double pane in 1999, all T12 lights were retrofitted to T$, replaced chiller, etc.) <br />1.02 The most recent 13 months of summary utility data for each account /building. <br />1.03 The most recent 3 months of actual utility bills for each account /building <br />1.04 Existing drawings, in particular mechanicalJHVAC and if possible architectural <br />elevations, floor plans, walllroof sections, window schedules and electrical <br />lighting plans and single line diagrams. <br />1.05 Your capital plan or a wish list of projects that you plan or would like to <br />implement in the next 1-5 years. <br />1.06 Overall building floor area and number of floors and fypical overall hours of <br />operation <br />2 Additional Useful Information: <br />2.01 A list of any chronic existing maintenance issues or tenant complaints. <br />2.02 Breakdown of building floor area by tenant, major use {e.g. <br />underground/enclosed parking garage, common, retail, conference center, <br />etc.) <br />2.03 Typical hours of operation, number of PC's and workers on shift by tenant or <br />major usage (not absolutely essential unless we want to benchmark in Energy <br />Star Portfolio Manager) <br />2.04 Any past condition assessments, master plans, energy studies and if <br />applicable asbestos surveys <br />2.05 Breakdown of annual maintenance budget /expenditures. <br />2.06 General description of mechanical systems (e.g. constant volume multizone, <br />district steam, central building chilled water) <br />2.07 General description of plumbing fixtures (e.g, low flow) <br />2.08 General description on lighting (e.g. Mostly 2'x2', 2 lamp U-tube parabolic with <br />T8 tamps and elecfronic ballasts) <br />2.09 The most recent three {3) years of monthly u#ility consumption data (e.g. <br />electric, natural gas, water, sewer) <br />2.10 AutoCad floor plans. <br />