My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011 013 Ordinance
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
2011 Ordinances
>
2011 013 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 4:07:02 PM
Creation date
9/7/2018 5:45:12 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Ordinance
Number
013
Date
4/25/2011
Year
2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~q,of Mayfield Village Energy Audit <br />cope <br />Page 2 of 2 <br />• Detailed construction cost estimates for recommended energy canservafion measures. <br />CLARIFICATIONS <br />^ Buildings to be audited have a total floor area of approximately 92,200 gsf. <br />^ Completing utility incentive and grant applications is not included. <br />SCHEDULE ,r~ <br />^ Project to start at Klck-off Meeting, where the a(ty will provide the following data for all buildings to the <br />best of their abilities: //~~ <br />o Building address; facilitylmaintenance contact; year built; years and descriptions of any <br />major renovations (e.g. all windows were replaced with double pane in 1999, all T12 <br />lights were retrofitted to T8, replaced chiller, etc.) <br />o The most recent 13 months of summary utility data for each account /building. <br />o The most recent 3 months of actual utility bills for each account 1 building <br />o Existing drawings, in particular mechanica}/HVAC and if possible architectural elevations, <br />floor plans, wall/roof sections, window schedules and electrical lighting plans and single <br />line diagrams. <br />o Your capital plan or a wish list of projects that yeu plan or would like to implement in the <br />next 1-5 years. <br />o Overall building floor area and number of floors and typical overall hours of operation <br />1 weeks from Kick-off Meeting to complete field survey ~/ <br />Prior to the end of June 2011 final Energy Audit will be submitted to the ! " <br />ADDITIONAL SERVICES <br />URS Corporation shall provide services for the project, when authorized in writing in addition to those <br />services set forth in the Basle Services including any services not otherwise listed in this proposal or not <br />customarily furnished in accordance with generally accepted architectural or engineering practice. <br />C:~Docnnunts ai:d Seltings~.dacalla~l.ceat Settings\'remporary 6demet FiteslContent.Omlook~P717I6821Exlubit A A4ayfield Village scope.doc <br />4/8/2011 4:42:04 P\1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.