Laserfiche WebLink
`Y ; `D ivlayfield Vil6age Green Corridor Masterplan <br />Existing +Proposed Trail Comparative Analysis <br />Currently in Mayfield vllage, there is 27,844 LF of Pedestrian Trails, both asphalt and gravel surtaces. The Mayfield Village Green <br />Corridor Masterplan is proposing to add an additional 4,918 LF of pedestrian trails and upgrage 5,594 LF of existing gravel trail to <br />an asphalt all-purpose trial. The total length of the existing and proposed pedestrian network is 29,884 LF. <br />???? <br />? P . <br />o aoo: soo izou <br />; <br />? Proposed Asphalt Trail <br />? Proposed Highland Road Sidewalk Existing Gravel <br />? Existing Gravel Trail upgrade to Asphalt Trail <br />Existing Gravel Wetland Trail <br />Existing Asphalt Trail <br />Paving Type Linear Feet <br />South Corridor Existing Asphalt Trail 4,970 <br />South Corridor Proposed Trail 4,918 <br />North Corridor Existing Asphalt Trail 12,378 <br />North Corridor Existing Wetland Gravel Trail 5,315 <br />Existing Gravel Trail to Asphalt Upgrade 5,181 <br />TOTAL 32,762 <br />44