My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010 001 Ordinance
>
Mayfield Village
>
Ordinances Resolutions
>
2010 Ordinances
>
2010 001 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 4:07:35 PM
Creation date
9/7/2018 6:17:46 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Ordinance
Number
001
Date
1/19/2010
Year
2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
`Y ; `D ivlayfield Vil6age Green Corridor Masterplan <br />Existing +Proposed Trail Comparative Analysis <br />Currently in Mayfield vllage, there is 27,844 LF of Pedestrian Trails, both asphalt and gravel surtaces. The Mayfield Village Green <br />Corridor Masterplan is proposing to add an additional 4,918 LF of pedestrian trails and upgrage 5,594 LF of existing gravel trail to <br />an asphalt all-purpose trial. The total length of the existing and proposed pedestrian network is 29,884 LF. <br />???? <br />? P . <br />o aoo: soo izou <br />; <br />? Proposed Asphalt Trail <br />? Proposed Highland Road Sidewalk Existing Gravel <br />? Existing Gravel Trail upgrade to Asphalt Trail <br />Existing Gravel Wetland Trail <br />Existing Asphalt Trail <br />Paving Type Linear Feet <br />South Corridor Existing Asphalt Trail 4,970 <br />South Corridor Proposed Trail 4,918 <br />North Corridor Existing Asphalt Trail 12,378 <br />North Corridor Existing Wetland Gravel Trail 5,315 <br />Existing Gravel Trail to Asphalt Upgrade 5,181 <br />TOTAL 32,762 <br />44
The URL can be used to link to this page
Your browser does not support the video tag.