My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010 001 Ordinance
>
Mayfield Village
>
Ordinances Resolutions
>
2010 Ordinances
>
2010 001 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 4:07:35 PM
Creation date
9/7/2018 6:17:46 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Ordinance
Number
001
Date
1/19/2010
Year
2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
= <br />Mayf eldy Villaxge Green Corridor Masf 11- . . .. . , <br />Existing +Proposed Trail Cornparative Analysis <br />As displayed in the previous map, segments of the existing pedestrian network are currently paved <br />with gravel. One alternative is to convert these paths to an asphalt surtace and widen them to <br />accommodate bicyclists and passing pedestrians. <br />EXISTIMG GRAVELTRAIL <br />• 4' wide <br />• tight for people passing in opposite directions, narrow for bicyclists <br />• gravel/dirt material <br />• rough surtace for bicyclists, muddy after a rain, diffcult to maintain <br />• currently designated as a"walking trail" <br />• more yearly maintenance <br />PROPOSED ASPHALT TRAIL <br />• 8-10' wide <br />• provides enough room to accommodate pedestrians and bicyclists <br />a asphalt material <br />• asphalt ideal for bicycles and runners <br />• would transition trail to an "all purpose trail" <br />45
The URL can be used to link to this page
Your browser does not support the video tag.