Laserfiche WebLink
Niayf eld= Village Green <br />Appendix C: <br />2009 Preliminary Cost of Construction - Overall Sumr°nary <br />Estimate: <br />Proposed Trail (Contingency and Engineering Fee's <br />TOTAL COST <br />Segment A $90,324 <br />Segment B $296,874 <br />Segment C $335,046 <br />Segment D $110,799 <br />Segment E $71,906 <br />Segment F $172,016 <br />Main Proposed Trail Subtotals (2009 Cost) $1,076,965 <br />3 Yr Inflation to 2012, @ 8% per year as per ODOT $1,356,666 <br />Trail Enhancements (Contingency and Engineering Fee's <br />included) <br />Cascade Overlook $113,132 <br />Beechers Brook Restoration $415,949 <br />Amphitheater (with building) $1,420,201 <br />The Civic Center Raingardens $73,153 <br />Traii Connector Options $62,843 <br />Highland Road Sidewalk $78,279 <br />Enhancements Subtotals (2009 Cost) $2,163,557 <br />3 Yr Inflation to 2012, @ 8% per year as per ODOT $2,725,459 <br />Project Total (2009) I $3,240,522 <br />3 Yr Inflation to 2012, Ca 8% per year as per ODOT $4,082,124 <br />UM 77