Laserfiche WebLink
tvic <br />Green <br />Appendix C: <br />2009 Preliminary Cost of Construction -Segment i4 <br />I QUAN UNIT UNIT TOTAL <br />PRICE COST <br />Preliminary Greenway Estimate: <br />Main Proposed Trail <br />Mobilization 1 LUMP $5,000.00 $5,000 <br />Demolition (fence removal) 1 LUMP $1,000.00 $1,000 <br />Clearing & Grubbing 1 LUMP $3,000.00 $3,000 <br />Excavation 8 Haul 572 CY $18.00 $10,290 <br />10'All-PurposeAsphaltTreil 1,103 LF $18.00 $19,845 <br />Deciduous Shade Trees, 2" cal. 30 EA $350.00 $10,500 <br />eeding (10' on each side where applicable) 3,000 SY $1.00 $3,000 <br />Garbage Cans 3 EA $1,250.00 $3,750 <br />rail Signage 1 LUMP $3,000.00 $3,000 <br />rail Segment A Construction Subtotal <br />10% Contingency <br />rail Segment A Construction Total <br />Engineering Fees <br />Construction Administration <br />rail Segment A Engingering Total <br />Project Total (2009) <br />Yr Inflation to 2012, @ 8% per year as per ODOT <br />$59,385 <br />$5,939 <br />$65,324 <br />$5,000 <br />$15,000 <br />$5,000 <br />$25,000 <br />78 <br />i ?