Laserfiche WebLink
Appendix C: <br />2009 Preliminary Cost of Construction - Segment C <br />I QUAN UNIT UNIT TOTAL <br />PRICE COST <br />inary Greenway Estimate: <br />7ain Proposed Trail <br />7obilization 1 LUMP $10,000 $10,000 <br />?aw CutAsphalt 1 LUMP $8,000 $8,000 <br />:learing, Grubbing, and some Tree Removal 1 LUMP $8,000 $8,000 <br />:xcavation & Haul 414 CY $18 $7,448 <br />0'All-PurposeAsphaltTrail 798 LF $18 $14,364 <br />0'All-PurposeAsphalt Trail (tacking on existing asphalt) 410 LF $5 $2,048 <br />?ridge Construction 110 LF $1,415 $155,650 <br />ting Strip (10' wide) 440 SY $20 $8,800 <br />ting Strip Curb Installation 396 LF $22 $8,712 <br />ace Existing Masonry Dumpster Enclosure 1 LUMP $15,000 $15,000 <br />ling (10' on each side where applicable) 670 SY $1 $670 <br />i Receptacle 1 EA $1,250 $1,250 <br />Signage 1 LUMP $3,000 $3,000 <br />Road Crossing <br />Rd Striping 1 EA $500 $500 <br />Ramp 2 EA $3,000 $6,000 <br />iway Signs 2 EA $300 $600 <br />rail Segment C Construction Subtotal $250,042 <br />0% Contingency $25,004 <br />rail Segment C Construction Total $275,046 <br />urvey $10,000 <br />Geotechnical $5,000 <br />Engineering Fees $30,000 <br />Construction Administration $15,000 <br />rail Segment C Engineering Total $60,000 <br />Project Total (2009) $335,046 <br />_ 3 Yr Inflation to 2012, @ 8% per year as per ODOT $422,061 $0 <br />i I