Laserfiche WebLink
r,.....,. <br />RE <br />? ?MaFyfeld-: Villxage ?Greeri? Corrido,r MU??terplan?? <br />x ? ¦ <br />q: <br />'Al <br />.?.?. x ?`,?. <br />Appendix C: <br />2009 Preliminary Cost of Construction - Segrnent D <br />I QUAN UNIT UNIT TOTAL <br />PRICE COST <br />Greenway Estimate: <br />in Proposed Trail <br />bilization 1 LUMP $5,000.00 $5,000 <br />avation 8 Haul 482 CY $18.00 $8,673 <br />All-Purpose Asphalt Trail 929 LF $18.00 $16,727 <br />ice Construction/Installation 700 LF $50.00 $35,000 <br />:;iduous Shade Trees, 2" cal. 25 EA $350.00 $8,750 <br />il Signage 1 LUMP $3,000.00 $3,000 <br />ading (10' wide each side where applicable) 850 SY $1.00 $850 <br />rail Segment D Construction Subtotal $78,000 <br />0% Contingency $7,800 <br />rail Segment D Construction Total $85,799 <br />ey $5,000 <br />ieering Fees $15,000 <br />;truction Administration $5,000 <br />Segment D Engineering Total $25,000 <br />roject Total(2009) $110,799 <br />Yr Inflation to 2012, @ 8% per year as per ODOT $139,575 <br />IJM 81