Laserfiche WebLink
? " '°?', 1?k"'?'+ .., k;.x;+' 'P?x+?$ #?' ?'?? T? R5 ?* ? .k ^'2T' ??rw^+i ?y(? N <br />'Yi ?.?'D":+ .W ? ?' ?^`.' +? `?'-s? ? Sii'•?+?y t <br />.Mayfeld`?Village Green? Corri?dor ?ulast?e?r?alan? <br />Appendix C: <br />2009 Preliminary Cost of Construction - Segment E <br />I QUAN UNIT UNIT TOTAL <br />PRICE COST <br />relimiroary Greenway Estimate: <br />iin Proposed Trail <br />obilization 1 LUMP $10,000.00 $10,000 <br />°aring 8 Grubbing 1 LUMP $3,000.00 $3,000 <br />cavation & Haul 389 CY $9.00 $3,500 <br />Existing Gravel Path to 10'Asphalt Pavement 1,050 LF $10.00 $10,500 <br />avel 272 CY $30.00 $8,167 <br />oofrolling 1,050 LF $5.00 $5,250 <br />?eding (10' on each side) 2,225 SY $1.00 $2,225 <br />rail Construction Subtotal <br />0% Contingency <br />Indated Trail Construction Total <br />ngineering Fees <br />onstruction Administration <br />pdated Trail Engineering Total <br />roject Total(2009) <br />Yr Inflation to 2011, @ 8% per year as per ODOT <br />$42,642 <br />$4,264 <br />$46,906 <br />$5,000 <br />$15,000 <br />$5,000 <br />$25,000 <br />$71,906 <br />$90,581 <br />$2 <br />? ??'