Laserfiche WebLink
Ilayf eldv.Villa?gee Gre`en C <br />Appendix C: <br />2009 Preliminary Cost of Construction - Segment F <br />I QUAN UNIT UNIT TOTAL <br />PRICE COST <br />nary Greenway Estimate: <br />Proposed Trail <br />learing & Grubbing <br />xcavation & Haul <br />' Existing Gravel Path to 10'Asphalt Pavement <br />(10' on each side) <br />rail Construction Subtotal <br />0% Contingency <br />Ipdated Trail Construction Total <br />ing Fees <br />tion Administration <br />Trail Engineering Total <br />roject Total(2009) <br />Yr Inflation to 2017, @ 8% per year as per ODOT <br />1 LUMP $10,000.00 $10,000 <br />1 LUMP $3,000.00 $3,000 <br />1641 CY $9.00 $14,770 <br />4,431 LF $10.00 $44,310 <br />1,149 CY $30.00 $34,463 <br />4,431 LF $5.00 $22,155 <br />2,225 SY $1.00 $2,225 <br />$130,923 <br />$73,092 <br />$144,016 <br />$5,000 <br />$15,000 <br />$8,000 <br />$28,000 <br />$172,016 <br />$216,690 <br />TIRS 83