Laserfiche WebLink
.`'?°f,?` "'•,; NO? ?. A ? a '?? ? IvlaYf eld? Villa- e` Green Corrido?? M?aster e raxn? <br />a?e.?'.?;"{'???" ? '? 9 ??•A? 3" a.' ^.S;y :? 3',+.+ .i:?,°?'? ? y?*? D o , s <br />e4ppendix C: <br />2009 Preliminary Cost of Construction - Trail Connector Options <br />I QUAN UNIT UNIT TOTAL I <br />PRICE COST <br />iminary Creenway Estimate: <br />Proposed Trail <br />ient "A" Connector Option Trail <br />ient "A" Connector Option Trail <br />:oat on existing asphalt) <br />?ent "B" Connector Option Trail <br />ient "D" Connector Option Trail <br />:oat on existing asphalt) <br />rail Segment B Construction Subtotal <br />0% Contingency <br />rail Segment B Construction Total <br />neering Fees <br />1ruction Administration <br />Segment C Engineering Total <br />roject Total (2009) <br />Yr Inflation to 2012, @ 8% per yeaO as per ODOT <br />1,090 LF $15.00 $19,620 <br />525 LF $5.00 $2,625 <br />435 LF $18.00 $7,830 <br />320 LF $5.00 $1,600 <br />$31,675 <br />$3,168 <br />$34,843 <br />$5,000.00 <br />$15,000.00 <br />$8,000.00 <br />$28,000.00 <br />$62,843 <br />$79.163 <br />84