My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010 001 Ordinance
>
Mayfield Village
>
Ordinances Resolutions
>
2010 Ordinances
>
2010 001 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 4:07:35 PM
Creation date
9/7/2018 6:17:46 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Ordinance
Number
001
Date
1/19/2010
Year
2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
tilayf eId Vill.age Green 1 <br />Appendix C: <br />2009 Preliminary Cost of Construction - The Civic Center <br />I QUAN UNIT UNIT TOTAL <br />PRICE COST <br />liminary Greenway Estimate: <br />Civic Center Raingardens <br />lization 1 LUMP $3,000.00 $3,000 <br />olition 1 LUMP $3,000.00 $3,000 <br />ivation & Haul 255 CY $18.00 $4,590 <br />? Removal 65 LF $25.00 $1,625 <br />h Basin Relocation 1 LUMP $3,000.00 $3,000 <br />Garden Soil/ Bed Prep 255 CY $40.00 $10,200 <br />Garden Curb Installation 490 LF $22.00 $10,780 <br />Garden Plant Selection 300 EA $15.00 $4,500 <br />Garden Signage 1 LUMP $3,000.00 $3,000 <br />iina 80 SY $1.00 $80 <br />;ain Garden Construction Subtotal $43,775.00 <br />0% Contingency $4,377.50 <br />:ain Garden Construction Total $48,152.50 <br />;y $5,000.00 <br />ieering Fees • $15,000.00 <br />truction Administration $5,000.00 <br />Garden Engineering Total $25,000.00 <br />roject Total(2009) $73,152.50 <br />Yr Inflation to 2012, @ 8% per year as per ODOT $92,151.08 <br />tM 85
The URL can be used to link to this page
Your browser does not support the video tag.