Laserfiche WebLink
A` 1M ??' <br />? <br />Ilayfield Vill.age Gree?n Co?rr?dor ?ulasterplan?? <br />. ......?;?? <br />Appendix C: <br />2009 Preliminary Cost of Construction - Cascacle Overlook <br />I QUAN UNIT UNIT TOTAL I <br />PRICE COST <br />'reliminary Greenway Estimate: <br />:ascade Overlook <br />Aobilization <br />;learing & Grubbing <br />:xcavation & Embankment <br />bpsoil Strip & Place <br />0' All-Purpose Asphalt Trail <br />)verlook Structure (10'x20') <br />?eeding (10' on each side) <br />Iverlook Construction Subtotal <br />0% Contingency <br />Iverlook Construction Total <br />ng Fees <br />:ion Administration <br />Engineering Total <br />roject Total(2009) <br />Yr Inflation to 2011, @ 8% per year as per ODOT <br />1 LUMP $5,000.00 $5,000 <br />1 LUMP $1,000.00 $1,000 <br />30 CY $18.00 $540 <br />90 CY $15.00 $1,350 <br />110 LF $18.00 $1,980 <br />200 SF $350.00 $70,000 <br />250 SY $1.00 $250 <br />$80,120 <br />$8,012 <br />$88,132 <br />$5,000 <br />$15,000 <br />$5,000 <br />$25,000 <br />$713,132 <br />$131.957 <br />86