Laserfiche WebLink
Mayfield??Village Gre? <br />Appendix C: <br />2009 Preliminary Cost of Construction - Highland Road Sidewalk <br /> QUAN UNIT UNIT <br />PRICE TOTAL <br />COST <br />Preliminary Greenway Estimate: <br />Main Proposed Trail <br />Mobilization 1 LUMP $5,000.00 $5,000 <br />Clearing & Grubbing 1 LUMP $2,000.00 $2,000 <br />Excavation & Haul 575 CY $18.00 $10,356 <br />Concrete Sidewalk (6' width, 4" depth) 518 SY $39.00 $20,202 <br />Gravel (6° depth) 259 CY $30.00 $7,770 <br />Seeding (6' on each side) 3,108 SY $1.00 $3,108 <br />Cons ruction Cos s 2009 <br />Trail Segment A Construction Subtotal $48,436 <br />10% Contingency $4,844 <br />rail Segment A Construction Total $53,279 <br />En ine rin Co s 2009 <br />urvey $5,000 <br />Engineering Fees $15,000 <br />Construction Administration $5,000 <br />rail Segment A Engineering Total $25,000 <br />Project Total (2009) $78,279 <br />Yr Inflation to 2071, @ 8% per year as per ODOT $91,305 <br />89