My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010 001 Ordinance
>
Mayfield Village
>
Ordinances Resolutions
>
2010 Ordinances
>
2010 001 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 4:07:35 PM
Creation date
9/7/2018 6:17:46 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Ordinance
Number
001
Date
1/19/2010
Year
2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mayfield??Village Gre? <br />Appendix C: <br />2009 Preliminary Cost of Construction - Highland Road Sidewalk <br /> QUAN UNIT UNIT <br />PRICE TOTAL <br />COST <br />Preliminary Greenway Estimate: <br />Main Proposed Trail <br />Mobilization 1 LUMP $5,000.00 $5,000 <br />Clearing & Grubbing 1 LUMP $2,000.00 $2,000 <br />Excavation & Haul 575 CY $18.00 $10,356 <br />Concrete Sidewalk (6' width, 4" depth) 518 SY $39.00 $20,202 <br />Gravel (6° depth) 259 CY $30.00 $7,770 <br />Seeding (6' on each side) 3,108 SY $1.00 $3,108 <br />Cons ruction Cos s 2009 <br />Trail Segment A Construction Subtotal $48,436 <br />10% Contingency $4,844 <br />rail Segment A Construction Total $53,279 <br />En ine rin Co s 2009 <br />urvey $5,000 <br />Engineering Fees $15,000 <br />Construction Administration $5,000 <br />rail Segment A Engineering Total $25,000 <br />Project Total (2009) $78,279 <br />Yr Inflation to 2071, @ 8% per year as per ODOT $91,305 <br />89
The URL can be used to link to this page
Your browser does not support the video tag.