Laserfiche WebLink
<br />y. ? .%r ., ? <br />x??'r.? .-,f`r+•?? ?$ ????? `??" ° <br />»'SG? 'k??. ?' ? ? ? ? <br /> ayf el,d? Village Green. Corridor&lul?aster <br />t lan <br /> <br /> <br />>. <br />< <br />- W . <br />4 <br /> <br /> <br />. . <br /> <br />. , <br />*? <br />' <br /> <br />r <br />.. <br />; <br />' ;•' <br /> <br />. <br />., . ,?.. ?', <br />, <br />.,. , .. <br />n . _ . <br />. <br />? <br />. <br />------------ <br />Appendix C: <br />2009 Preliminarv Cost of Construction - Amphitheater <br /> Ql1AN UNIT UNIT <br />PRICE TOTAL <br />COST <br />reliminary Greenway EsUmate: <br />Phase 1: Amphitheater Grounds <br />Mobilizadon 1 LUMP $10,000.00 , $10,000 <br />Demolition 7 LUMP $3,000.00 $3,000 <br />IearingSGrubbing 1 LUMP $2,000.00 $2,000 <br />opsoil Strip 8 Place 1670 CY $15.00 $24,150 <br />Excavation 6 Embanlanent 6550 CY $9.00 $58,950 <br />Earth Borrow 3640 CY $25.00 $91,OOD <br />Conc.seatvraA 713 LF $50.00 $35,646 <br />Basic Electrical5ervice 1 LUMP $50,000.00 $50,000 <br />Cur6 Cut 144 LF $25.00 $3,600 <br />Catch Basin 4 EA $1,500.00 $6,000 <br />12'CUNert,HDPE 570 LF $30.00 $77,1DO <br />ccessDrive,AspheltConttete 680 SY $35.00 $23,8D0 <br />Stage Wall 165 LF $60.00 $9,900 <br />pge FII Earth 74 CY $25.00 $1,850 <br />tageAggregateFll 37 CY $40.00 $1,480 <br />tage Concrete Slab 6' 222 SY $60.00 $13,320 <br />fage Ramps 8 Steps 1 LUMP $5,000.00 $5,000 <br />'All-PurposeAsphaitTrail 850 LF $15.00 $12,750 <br />rees, 2° cal. 20 EA $350.00 $7,000 <br />ignage 1 LUMP $3,000.00 $3,OOD <br />eeding 12,000 SY $1.00 $72,000 <br />phitheaterSUbtotal $397,546 <br />10% Contlngenry $39,155 <br />phitheaterConsWC[ion iofal $430,701 <br />urvey E70,000 <br />Engineering Fees E50,000 <br />Consttuction Administrrtion 535,000 <br />mphitheaterEngineering Tofal f85,000 <br />Phase 1 Project Total (2009) $515,701 <br />Yr Inflation W 2077, @ 8% per year as per ODOT §649,634 <br /> qUAN UNIT UNIT <br />PRICE TOTAL <br />COST <br />Preliminary Greenway Estimate: <br />Phase 2: Amphitheater Structures <br />Building 2,500 SF $250.00 $625,000 <br />BandstandSWCWre 2,000 SF $45.00 $90,000 <br />Co s a Cos 009 <br />mphitheaterSubWtal $715,000.00 <br />10% Contingency $71,500 <br />Amphitheater Construction Total ;786,500 <br />P " e ' Costs 008 <br />Geatech §8,000 <br />Engineering Fees $75,000 <br />ConsWCtion Administration $35,000 <br />Amphitheater Engineering Total E776,000 <br />Phase 2 Pmject ToW (2009) f904,500 <br />Yr InFlation to 2012, @ 8% per year as per ODOT $1,139,470 <br />88