My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009 048 Ordinance
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
2009 Ordinances
>
2009 048 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 4:08:07 PM
Creation date
9/7/2018 8:40:03 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Ordinance
Number
048
Date
10/19/2009
Year
2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FY07 UASI Grant AppliCalion <br />* IIiring of Full ur Fart-Time Staff or Contractors/Consultants <br />• Overtirne and Backti]] Costs <br />9 Travel <br />• Supplies <br />+ qther ltcrns <br />Authorized Exercise Casts <br />• Funds Used to Design, Devclop, Conduct and Fvaluate an Exercisc - Includcs cosls <br />rclated to planning, meeting space and other rneeting custs, facilitatian costs; materials <br />and supplics, travel, and documentation. <br />• Hir'rng af Fuil ur Part-Timc Staff or ContractorslCansultants - FuII or part-time staff <br />or cantractors/GOnsultants may be hired to support exercise related activities. Payrnent of <br />salaries ar,d fringc benefits must be in accordance with established IocaI ?mdJor state <br />guidelines, Contractars/consultants may anly be hudgeted for by those caunties that are <br />utiiizing a contractor, hired through local procurement and cantracting pracedures, who <br />has compleEed the HSEEP Mobi]e Training Course. <br />• Overtime and Backfili Costs - pvertimc and backfill c.osts associated with the design, <br />development, conduet and evaluatic}n of exerGises are allowable expenses. Payment of <br />overtimc and back?ili is for work that is performcd over and above a normal workweek <br />and within established statc ar Iacal guidelincs. Yn na case is dual comPensation <br />allowablc. Fringe benefits on overtime hours are limited to FiCA, Worker's <br />Compensation and Unemployrnent Compensation. <br />•1'raWet - For expenses (i.e. airfare, rnileage, per diem, hotcl, etc.)'of employees on <br />afticial business related to the planning and conduct of the exercisc project(s). <br />• Supplies - Iterns that are expended c,r consumed during the course oE` the planning or <br />conduct of the exercise project(s) (i.e. copying paper, gIovcs, #ape, moulage kiis or <br />supplies, triage tags). <br />• Othet Items - Cp5t5 rxrould include rental space/locations for exercise planning and <br />conduct, signs, badges, eic. <br />. Unautharized Exercisc Casts <br />Unauthurize;d exercise-related cosls inctude: <br />• Reimbursement for the maintenancc and/or wcar and tcar costs of gencral u5e vehicles <br />- ----- -- - -- - <br />1.?. construcfion - vehicles) and e-tttergency response apparatus (i.e, fire trucks, <br />ambulances). The only vehicle cvst that is reimbursable is fuel/gasoline. <br />+ Equipment that is purchascd i'or permanent installation and/ar use beyond lhe scope of <br />exercise conduct (i.e. eiectrpnic mcssaging sigrrs). <br />NOTE: Fxercisc tunds may not be used for first lresponder equipment; activities unrelated to <br />cxcrcises; or pcrsannel, travel, supplie;s, vr other ilems procured prior to the award start date of <br />thc granl ar otherwisc budgeted for with State or local funds. Queitions in regards ta <br />aIluwable expcnses shuuld 6e addressed to thc OEMA Exercise Program Manager. Page 24, September, 2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.