Laserfiche WebLink
01/19/2005 WED 17; 21 FAX 440 442 5077 MV BLDG DEPT <br />.r <br />ApriI 24, 20.04 <br />Mr. Phillip. M. Brett ? . ? . ? . . . . ? <br />Director of Finaace and Econoinic Development , . • ? ? ? ? ' <br />. Mayfield VillaSe. . ? . . . . , . " , <br />. 6621 Wilson Mil1s Road <br />Mayfield Village, Ohxo 44143 ' : • ? ? ? ? . ? ? ,? <br />Subject: <br />'DeakMr. Brett: <br />The 'Great Lakes Construction Company has submitted the appropriate iiack-up documentation for Cha,nge Orcier Nv. 1 and Extra Work Order No.1. Both Change Order No.' 1 and Extra Work Order <br />N'o. ?1 present an accumulation of the additional c.osts and credits thatoccuired during the-2003. - <br />construction season. The costs and credits were generated by chariges to- the- contract documents <br />caused by Changed Conditions, Unforeseen Conditions, Contractor R.eques.t, an.d Owner Requests. <br />These issues are.summarized helow with addit'ioaal detailed descriptions contained bothim the . <br />Change Order and Extra Work Order farms. '• ISSUE No. i --120" JUNCITON CHANYAER CREDiT. . • , 'The inifial -p}iases of the praject required the insfa.llation of a 120" ceilvert attd the adjusfiment of the <br />. existing profile. X3ue to the tnne consa-dints of this Phase I work area, the Contractor pr.oposed #he, <br />elimination of the junction chamber by rcvising the culvert pcofile. Tlie savings of both time and ' <br />money wer.e evaluated and found tb be beneficiai ta the:pxoject. T ' he Juaction Chamber Loca.ted at <br />STA. 76+35-33 LT. vvas eliminated resulting in a$35,250.12 Credit to tle pro}ect. . . <br />2001/004 <br />XSSUE No. 2 - 48" WYE CQNNECTION CRIDIT. : <br />-Thc clunination of the Junction Chamber LoCated at STA. 76+35V33.LT. alIowed the downstreani . <br />dtainage eleinents to` be reconfigured resviting in a Credit to the proj&ct. The Credit value is derived from the non-perfortn&d conduit ($13,91400)less the cests of the additional-conduit xequzred . . <br />($2,376.00) and eoring uito the 120" culvert ($I50.00). The total credat of $11,388.00 was accepted. . <br />ISSUE No. 3 - MS CONCI2ETE CREDIT. . . . ' <br />' The Contractor offered a$1.10 credit for the vse of Clas's :C c.oncrete in 'lieu of the specified Class . <br />MS. The initial credit value was $92,611.20.howev.er-the Issua No. 6 x+evision o£the pavement area <br />(84,192 SX' to 83,620_ SY) rtduced the credit valuo to $91,820:00. Allowing 10;000 SY ofMS . <br />concrete to be used for drivewavs and "uitersection presents a tbUL?rE_it of $80,982.00.to the project. <br />ISSUE No. 4 ; ADDTTIONAL MEDIAN ZSLANDS. <br />The Owner requesEed the Lypical section be revised fo add addrtional median islands to the northem <br />por.tion of the project. Due to the incrcase ofthe adc?iitional island, the pavement area was x?educed 'from 84,192 SY to $3,620 SY: the reduction of pavement area and the introductioa of the additional <br />island adversely affected the Contractor's production xates thus resulti.ng in a renegatiated unit price <br />for the pavement. This change to the cantract documents creates an, addition to the'contzict value-of <br />'$272,936.00 <br />564 white Pond Drivc <br />Akron, OH 44320-1100 • <br />TCi:330.836.9111 Fax: 330.836.9115