Laserfiche WebLink
MAR. 13. 1998 5: 20PPd BRAPdDST~T ~ l;R CAP,ROI.I. <br />2.6.4 The ATChittct shall be a representative of and shalt advise <br />and Consult with the Owner (1) during construcuon until final <br />payment to the Contactor is due, and (2) as an Additional Ser- <br />vice at the Owner's direction from time to timt during the cor- <br />rection period described In the Contract for Construction. The <br />Architect shall have authority to act on behalf of the Owner <br />only to the extent provided in this Agreement unless otherwise <br />modified by written instrument. <br />x.6.5 The Architect shall visit the site at intervals appropriate <br />to the stage of construction or as othctwise agreed by the <br />Owner and Architect in writing to become gcnrtally familiar <br />with tht progress and quality of the Work completed and co <br />determine in general !f the Work is being performed in a man- <br />ner lndicadng that the Work when completed will be in accor- <br />dance with the Contact Documents. However, the Architect <br />shall not be required co make exhaustive or continuous on-site <br />lnspecuons to check the quality or quantity of the Work. On <br />the basis of on-site observations as an architect, the Architect <br />shall keep the Owner informed of the progress and quality of <br />the Work, and shall endeavor to guard the Owner against <br />de[ecrs and detlc;encics in the Work. (More ezte,esfie sire <br />representation -nay be agrc~:d ro us u>n Rddltional Serelcs, as <br />descr(bed !n Paragraph j.2.J <br />2.6.6 The Architect Shall not have control over or charge of <br />and shall not be responsible for construction means, methods, <br />techniques, sequences or procedures, or for safety precautions <br />and programs in connection with the Work, since these are <br />solely the Contractor's responsibility under the Contact for <br />Construction. The architect shall nut be ruponsiblt for the <br />Contractor's schedules or failure to Carry out the Wprk In accor- <br />dance with the Contna Documents. The Architect shall not <br />have control over or charge of acts or omissions of tht Contrac- <br />tor, Subcontractors, or their agents or employees, or of any <br />other persons performing portions of the Work. <br />2.B.7 The Architect shall at all times have access to the Work <br />wherever it is in pccptirttion or progress. <br />2.6.6 Except as may otherwise be provided in the Contract <br />Documents or when. direct communieadotu have been spe- <br />cially authorized, the Owner and Contractor shall communicate <br />Through rhr Archltea. Communications by and with rhr Archi- <br />trct's consultants shall be through the Archttcct. <br />2.6.9 Sascd on the Architeci's observations and evaluaT+ons of <br />the Contactor s Applications for Payment, the Architect shall <br />review and certify [hc amounts due tht Contractor. <br />2.6.10 The Architect's certification for payment shall consri- <br />tutc a representation t0 the Owner, based ou the Architect's <br />Obsefva[ions at the site as provided in SubpaagraphL.G.S :end <br />on the data comprising the Contractor's Application for Yay- <br />ment, that, ro the best of rhr Art:hitcet's knowledge, informa- <br />tion and belief, rhr Work has progressed to the point indicated <br />and the quality of Work is in accordance: with the Contact <br />Document. The fi~regning representaaorLS :ate subject to an <br />evaluation of the Work for Conformance with the Contact <br />Documents upon Substantial Completion, to results of subse- <br />quent tests anal inspections, to minor deviations from the Con- <br />tnrct Documents carrectablc prior to completion and to spc- <br />ciFic gtulifcttians expressetl by the ArehirtCt. 1'hr: issuance o!a <br />Certific:ttc for P;iytlteitt shall further mnstitutc a ~rcprescntatinn <br />that the Contractor is entitled to frayment in the amount Certi- <br />fied. However, the issuance of a Certificate for Payment shall <br />not be a rt'prr5cntatiUn Hutt the Architec[ hat (1) made exhauc- <br />tivr ar Conrinuau.: tin-aitc inapcctkrns to check the quality yr <br />:i0.. ~~Y '. 13 <br />quantity of the Work, (2) reviewed construction means, meth- <br />ods, techniques, sequences or procedures, (3) reviewed copies <br />of requisitions received from Subcontractors and material Sup- <br />pliers and other data requcsteti by the Owner to substantiate <br />the Contractor's right to payment or (4) asccrtaincd how or for <br />what purpose the Contactor has used money previously paid <br />an account of the Contract Sum. <br />a.6.i 1 The Architect shall have authority to reject Work which <br />does not conform to the Contract Documents- whenever the <br />Ar_liitect Considers it necessary or advisable for implcmtnta- <br />tion of [he intent of the Contract Documents, the Architect wUl <br />have authority to require additional inspection or testing of [hc <br />Work in accordance with the provisions of the Contract Docu• <br />meats, whether or not such Work is Etbticattd, installed or <br />completed. However, neither this authorlty of the Architect nor <br />tt decision made in good faith either to exercise or not to cxtr- <br />eiSe such authorlty shall give rase to a duty or rtaponsibility of <br />the Architect to tht Contractor, Subcontractors. material and <br />equipment `suppliers, their agents or employees or other per- <br />sons performing portions of the work. <br />2.6.12 The Archttect shall review and approve or rake other <br />appropriate action upon Contractor's submittals such as Shop <br />t)rawings, Product Data and Samples, but only for the limitcci <br />purpose of checking for conformance with information given <br />and the design concept expressed in the COptraC[ Documents. <br />The Architect's action shall be taken with such reasonable <br />promptness a5 r0 cause no delay in the Vvork or in the con- <br />strucrinn of The Owner or of separate contractors, while allow- <br />ing sufficient time in the Architect's professional lodgment to <br />permit adequate review. Review of such submittals is not Con- <br />ductecl for the purpose of determining the accuracy and com• <br />pleteness of Other details such as dimensions and quantities or <br />for substantiating instructions for installation or performance of <br />equipment or systems designed by the Contactor, all of which <br />remain the responsibility of the Contactor to the extent <br />required by the Contract Documtnts. The Architect's review <br />shall not constitute approval of safety precautions or, unless <br />Otherwise specifically stared by the Architect, of construction <br />meant, methods, techniques, sequences or procedures. The <br />Architect's approval of :t specific i[em shall nor indicate <br />approval of an assembly of which the item is a component. <br />When professional cenificatton of performance CharaCCe[iscics <br />of matcrittle, systems or cqt+ipmen[ is required by the Contract <br />Documents, the Architect shall lx entttlcd to rcl}• upon such <br />certification to establish that the matcrial5, systems or equip- <br />ment will meet rhr pcrformaace Criteria required by the Con- <br />tnct Aocuments. ' <br />2,6.13 The Architect shall prepare Change Orders and Con- <br />struction Change Directives, with supporting documcnrrtion <br />and data if deemed necessary by rhr Architect as provided in <br />Subparagraphs 3.1.1 and 3.3. j, for the Owner's approval and <br />exct:utiun in accordance with the Comma Documtnts, and <br />may authorise minor Changes in the Work no[ involving an <br />adjtisunent in the Contract Sum or an extension of rhr Contract <br />Time which are nut inconsistent With [hc intent of the Contract <br />Documtnts. <br />2.6,14 The Architect shall conduct inspections «~ determine <br />the date or darts of Substantial Completton and the date of final <br />Completion, shall receive and forward to the Owner for rhr <br />Owner's review and records waittett warranties and related <br />dcrcumcticr rryuired by rhr Comraa Documents and assem- <br />bled by thcContractor, and shall ig.uc a final Certificate for Pay- <br />ment upon compliance wi[h rhr requirements of the Contract <br />Dt~ctrmcnl~. <br />AIA oOCUtMENT ®141 ~ UWNER-AACHiTFCT AGREEtNEN7 • FOuttTfi&NtH EDITION ~ AIA~ • m t98T <br />B~ 41-~ 957 l't1! AMliltl(:AN 1N.STITUTE OF ARCHITECTS. 1735 NEB YOIIK AVF1VUti, N.W., WASHINGTON, D.C. 2000G <br />WAHNIt~: Uedket-s;td ptatoeopytng Wotetes U.S. copyright Ittw~ end to wbpct a Itgal ptosecutton- <br />