Laserfiche WebLink
NOW, THEREFORE, in consideration of the mutual promises <br />and agreements hereinafter set forth, Purveyor and Customer agree <br />as follows: <br />ARTICLE I. STAND-BY INTERCONNECTION <br />A. Customer shall, at Customer's expense, install a <br />master meter and hardware and a meter vault at SOM Center Road at <br />the County line. Customer shall install, own, test and maintain <br />a master meter and vault at Customer's expense to be located near <br />the check valve described in paragraph B of this Article. <br />Purveyor, at its own expense, shall have the right to inspect and <br />master meter upon request and reasonable notice, and shall be <br />entitled to verify meter readings and witness accuracy testing. <br />B. Customer shall, at Customer's expense, install, own <br />and maintain a pressure regulating check valve in the existing <br />meter vault at SOM Center Road at the County line. "Pressure <br />regulating check valve" shall mean an adjustable device which <br />permits the transfer of water into Customer's system whenever the <br />water pressure in Customer's system falls below the water <br />pressure in Purveyor's system; however, in no event shall the <br />device permit Customer's water to enter Purveyor's system. Prior <br />to installation, Customer shall provide Purveyor with detailed <br />specifications of the pressure regulating check valve. Purveyor <br />shall have the right to inspect and approve the pressure <br />regulating check valve after installation, and Customer shall <br />notify Purveyor when the check valve is ready for inspection. <br />Regulation of the pressure settings on the valve shall be <br />determined by Customer. <br />-2- <br />