My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016 013 Ordinance
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
2016 Ordinances
>
2016 013 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 4:11:50 PM
Creation date
9/11/2018 6:27:35 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Ordinance
Number
013
Date
5/16/2016
Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
February 29, 2016 <br />Mr. Bill Thomas <br />Mayfield Village <br />6622 Wilson Mills Road <br />Mayfield Village, Ohlo 44143 <br />Re: Mayfield Village -Parkview Pool Filter/ Heater Room <br />Dear Mr. Thomas: <br />k <br />i,,.~ i`" 'e . 1~6 ~ ~ i.. ~, <br />Meld Architects, Inc. (MELD) is pleased to submit this proposal for the addition of a new pool heater <br />room to be attached to the existing pool filter room located at Parkview Pool at 425 North Commons <br />Blvd. in Mayfield Village. This letter outlines our understanding of the scope of work and services <br />needed to provide you with a successful project. <br />Scope of Services <br />!t is our understanding that the scope of the project includes the addition of a masonry structure to <br />house the pool heater in a separate room from the filter room. We understand the replacement of all <br />existing filters and related plumbing, electrical and mechanical systems are to be replaced in their <br />entirety and are to be included in our scope of services to the extent of describing the pool consultants <br />work and coordinating between all engineering trades. We have been provided by the Village with <br />the estimate for the replacement of the pool filters to be +/-$ ] 05,000. Based on this estimate, the <br />anticipated total construction cost for this project is $215,000 - $250,000. The recommended <br />services for this project are as follows: <br />Basic Services <br />We Typically approach renovation and addition services with a schedule that follows the flow of our <br />work: <br />A. Existing Conditions Documentation and Field Measuring <br />B. Schematic Design /Design Development <br />C. Construction Documentation <br />D. Construction Administration <br />A.~x's' g Conditions Documentation and Field Measuring <br />-Provide background drawings of the existing conditions and Field Measure for accuracy. <br />-Photographic documentation of the existing space for record purposes. <br />-preliminary code review of existing conditions <br />Deliverables: <br />• Background drawings with Photographic Field Report <br />• Preliminary Code Analysis <br />B. Schematic Desi~c. n j Design Development <br />Meet to review the proposed schematic design and develop to prepare for construction <br />documentation. <br />-Review scope of demolition and relocation of existing equipment. <br />EXHIBIT' <br />
The URL can be used to link to this page
Your browser does not support the video tag.