My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016 013 Ordinance
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
2016 Ordinances
>
2016 013 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 4:11:50 PM
Creation date
9/11/2018 6:27:35 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Ordinance
Number
013
Date
5/16/2016
Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mayl'Ield Village - Parkview Pooi Filter/ Heater Room <br />Page 2 of 4 <br />-Review scope of the appropriate specifications for new equipment. <br />Deliverables: <br />• Proposed Design and Mechanical/ Electrical/ Plumbing and structural solutions <br />• Include a description of the pool consultants scope of work <br />• Material Samples <br />• Complete Code Analysis <br />C. Construction Documents <br />-Provide Construction Documents prepared to achieve all required plan approvals to achieve building <br />permits, provide for bidding, and construction. <br />All mechanical, electrical, plumbing and structural engineer services will be included <br />-Assist with the Bidding Process <br />-Provide Bidding Documents <br />Attend PreBid Meeting <br />-Respond to Requests for Information {RFl'sM <br />-Review Submitted bids for selection of lowest bidder <br />Deliverables: <br />• Construction Documents <br />o Drawings <br />o Specifications <br />D. Construction Administration <br />Administration and observation of the execution of the Construction Documents. <br />-Attend Weekly Owner/ Architect/ Contractor meetings <br />-Respond to RFI's <br />-Review product submittals and shop drawings <br />-Review Change Order Requests <br />Deliverables: <br />• Field observation notes and photographs <br />• Final Punchlists <br />Compensation for Basic Services <br />We propose to provide the above-stated Design Services for the fees as indicated below. <br /> <br />A. Existin Conditions Documentation and Field Measurement* Lum Sum 2,000.00. <br />B. Sc erratic Design ~ Design Deve o ment lum Sum 7,500.00 <br />C. Construction Documents Lum Sum 10,500.00 <br />D. Construction Adminlstratton Lump Sum 2,200.00 <br />Total ~2z ~oo.oo <br />21Pacie <br />
The URL can be used to link to this page
Your browser does not support the video tag.