My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/19/1994 Meeting Minutes
DOcument-Host
>
Mayfield Village
>
Meeting Minutes
>
1994
>
08/19/1994 Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2019 9:12:14 AM
Creation date
7/18/2018 8:55:55 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Meeting Minutes
Date
8/19/1994
Year
1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
227 <br />MINUTES OF SPECIAL COUNCIL MEETING <br />Mayfield Village <br />August 19,1994 <br />The Council of Mayfield Village met in Special Session on Friday, August 19,1994, at <br />eight-thirty five a.m. (8:35 a.m.) in the Council Chambers at Village Hall. Council <br />President Joanne Cinco presided. <br />? <br />Present: Santo Basile <br /> joanne Cinco <br />Q Wallace Ferrante <br />? Mark Fixler <br />C Lawrence Flynn <br />C William Buckholtz <br />Absent: Vince Busa <br />Also Present: Mayor Bruce Rinker <br />Phil Brett <br />Tom Cappello <br />Dorothy Martin, Acting Clerk <br />PURPOSE OF THE MEETING: To consider additional expenditures for the Wiley Park <br />drainage channel (and any other matter that may come before Council.) <br />Nlrs. Cinco stated that most of the Council members were at Wiley Park to take a look at <br />the measures they want to incorporate into the project. She had indicated to Sandy <br />Basile that if he had any input, to let her know. She questioned if this was to be an <br />emergency approval of the $15,000.00 to cover the additional work. <br />Mayor Rinker stated this is a modification to the original plan. He was of the opinion <br />that everyone should understand that this is over and above the initial work. It is an <br />add on to the initial contract. The approval should be "not to exceed $15,000.00." The <br />extra rock is worthwhile; it will be a means of erosion control, water detention to some <br />extent, and it will add to the longevity and aesthetics of the project. With some <br />plantings added, it will enhance the park. The rock is huge and should not get shuffled <br />around by the water flow nor vandalized by children using the park. <br />Mr. Ferrante, seconded by Mr. Flynn, made a motion to authorize an additional <br />expenditure not to exceed $15,000 for extra work on the Wiley Park drainage ditch. <br />(Original contract awarded per Ordinance 94-38 on June 20,1994.)
The URL can be used to link to this page
Your browser does not support the video tag.