My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/20/1996 Meeting Minutes
DOcument-Host
>
Mayfield Village
>
Meeting Minutes
>
1996
>
05/20/1996 Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2019 9:12:43 AM
Creation date
7/18/2018 9:53:41 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Meeting Minutes
Date
5/20/1996
Year
1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mayor Rinker said the chairs will be here tomorrow. We were not anticipating <br />having a meeting here tonight. However, there is no air conditioning at Village <br />Hall. Mayor Rinker said he would like to get this operation up and running in <br />another month [using the Community Room for Council meetings.] We must <br />consider what we want to do to get our sound system functioning well enough. He <br />would like comments about the tables. <br />Council President Fixler had no comment at this time. <br />Buil?din g_- Mr. Samac gave an update about the barns and old buildings at the north <br />end of the Village. He said they are expecting a report on the asbestos on <br />Wednesday. It is a clear report, there is a 10-day waiting period; then they will be <br />able to burn the buildings down. Also, they promised to take care of the weeds in <br />the first 100 feet. <br />Engineer - Mr. Cappello said the contractor working on the Worton Park Sewer <br />project is now about 25% done with Norman Lane. He will proceed to North <br />Woodlane, South Woodlane and Woodlane. On the North Cottnty trunk line, they <br />have completed to Miner Road. They are estimating about a three-week delay but <br />lag time was built into their estimate. <br />Fire - Chief Mohr said they are probably about a week and a day from starting to <br />move into the new facility. The cleaning company is coming Wednesday. Most of <br />the furniture was delivered. He asked if there was any word about the signal. <br />Mr. Cappello said they received word back from O.D.O.T. They have requested we <br />signalize the Sandalwood intersection (with two signals facing Sandalwood.) To do <br />so, we will have to include another mast iron. He estimates an additional cost of <br />$5,000.00 for the mast arm and pole. <br />Council President Fixler questioned if they are requesting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.