My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/16/1986 Meeting Minutes
DOcument-Host
>
Mayfield Village
>
Meeting Minutes
>
1986
>
06/16/1986 Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2019 9:14:49 AM
Creation date
7/23/2018 4:41:03 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Meeting Minutes
Date
6/16/1986
Year
1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
70 <br />do with the replacement of a fire hydrant in March. A pipe was broken that <br />goes under their drive and damaged their lawn. Mrs. Farinacci said <br />that she is concerned because she and others are feeling alot of.negative <br />feeling because concerns are not answered right away. She also stated <br />that a bottle of poison that they reported to the Village last year that <br />was supposed to be picked up by the Village, has not yet been picked up. <br />Mro Amendola said the responsibility for Mrs. Farinacci's problem is <br />technically not the Village's. A private contractor was hired by the Cleveland <br />Water Department to do water repairs on hydrants. It is their responsibility. <br />He has been in contact with the company (who is located in Michigan) <br />about these problems but they have not returned to make the repairs. <br />He said they have been waiting to hear.from the contractor. Mr. Amendola <br />said the Village will make this repair and take care of the lawn too. <br />Mayo.r Carmen said the Village should make the repair for the homeowner and <br />try to contact the contractor for reimbursement. He thinks the next step <br />is to look at filing action against the contractor. <br />Mr. Feneli asked if Mr. Amendola has contacted the Water Department. <br />Mr. Amendola said he talked to Mr. Thompson at the Water Department. <br />Mr. Feneli said we would have to find out the name of the bonding <br />company who wrote the performance bond for the contractor hired by the <br />Cleveland Water Department in order to take action. <br />Mr. Amendola said the pipe had been installed, but he did not want to <br />complete the asphalt work until he began the asphalt repairs on the -: <br />Village streets which will be in about a week and a half. <br />Mayor Carmen asked Mrs. Farinacci if she could put up with the problem that <br />long. <br />Mrs. Farinacci questioned the safety of driving into and out of her driveway. <br />Mr. Amendola told Mrs. Farinacci that she would be able to dr.ive over the <br />pipe the way it was presently with no damage. <br />Mr. Petschauer asked if the Village is required to make inspections of <br />the work done. <br />Mr. Amendola said the contractors must advise them every time they come in <br />town to do work, but no inspections of their work is made. <br />Mayor Carmen said we need to look at our response time and suggested that <br />residents contact their ward councilperson to follow up on items requiring <br />replies. <br />?J
The URL can be used to link to this page
Your browser does not support the video tag.