My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/21/2008 Meeting Minutes
DOcument-Host
>
Mayfield Village
>
Meeting Minutes
>
2008
>
04/21/2008 Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2019 9:26:48 AM
Creation date
7/18/2018 5:31:32 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Meeting Minutes
Date
4/21/2008
Year
2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Regular Council Meeting <br />4-21-08 <br />Page 16 <br />008 - Modification of cast stone headers around <br />windows $4,500.00 <br />- We are going to do that. <br />012 - Use of aluminum over copper for utters $17,700.00 <br />- We chose to do that. <br />013 - Removal of cupola and finials $14,400.00 <br />- We did not specifically agree to that. <br />Chief Dearden indicated he does not believe Council made a decision one <br />way or the other on those. The cupola is the decorative top. The cupola <br />and finial match the other buildings. Mr. Marrelli does not believe we <br />ever came to the conclusion that we were going to remove those. It is on <br />the fire station. Council President Buckholtz suggested we leave it. <br />Before all of these modifications are accepted, Council President <br />Buckholtz asked for the advice of the Finance Director. We can do a <br />straw pole if anyone has any outstanding issues. Council agreed to leave <br />that one in. <br />Mr. Dinardo mentioned that some of these items can be put on the spec as <br />an alternate. On the drawing we can ask what the cost is for the cupola <br />and finials. <br />Mr. Marrie stated we should know what it would cost if we want to do it. <br />Mr. Maa-relli indicated that is what we will do. <br />014 - Elimination of a metal ceiling in rooms <br />104,105,106 $1,600.00 <br />- There is already a pre-cast concrete ceiling. We don't need <br />the metal ceiling. <br />015 - Modification of ceilin tiles $9,200.00 <br />- This is just a different type of ceiling tile. <br />018 - Anticipated reduction in geothermal HVAC <br />system $400,000.00 <br />- This would be through redesign <br />Mr. Saponaro asked if we could look at this item both ways. Mr. Dinardo <br />indicated we cannot. You would be doing a split system similar to what we <br />have here, where you have a condenser outside and a furnace inside. <br />Because of the constraints of the site, we do not have any room for the <br />condensers and we would have to clo some modifications to the roof. That is
The URL can be used to link to this page
Your browser does not support the video tag.