My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/25/2004 Meeting Minutes
DOcument-Host
>
Mayfield Village
>
Meeting Minutes
>
2004
>
06/25/2004 Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2019 9:27:03 AM
Creation date
7/18/2018 5:55:34 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Meeting Minutes
Date
6/25/2004
Year
2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 ? -? <br />WORK ORDER NO. 6 S.O.M. CENTER/WHITE ROAD WIDElvING <br />CONSTRUCTION ADMINISTRATION AND ENGINEERING <br />URS CORPORATION/MAYFIELD VILLAGE <br />AGREEMENT DATED FEBRUARY 3,1998 <br />MODIFICATION NO.10- Dated June 2, 2004 <br />This Work Order Task is being performed as an extension of the Professional Engineering Services <br />Agreement between Mayfield Village and URS Corporation (URS), formerly known as URS <br />Greiner, dated February 3, 1998. All terms and conditions stated therein are incorporated into this <br />Work Order by reference. The MOD No. 10 modifications to the base document, which was <br />previously approved by the Client, are annotated by bold italics font. Resident Inspection services <br />were moved to Work Order No. 7 and incorporated therein as part of Modification No. 1. <br />SCOPE OF SERVICES <br />This Work Order provides for bidding and construction administration services during the <br />construction of the widening and reconstruction of S.O.M. Center/White Roads under one (1) <br />construction contract. The contract for the construction of S.O.M. Center Road shall be twenty-four <br />(24) months in duration. S.O.M. Center Road would be widened to five (5) lanes for an estimated <br />length of twelve thousand seven hundred (12,700) lineal foot. White Road would be widened to <br />three (3) lanes for an estimated length of twelve hundred (1,200) lineal foot: The design, plan <br />preparation; and construction phase services would be performed to be consistent with the new <br />ODOT Local Public Agency Policy. <br />URS will provide the following specific consulting services in assisting the Client during the bidding <br />and construction phases of the project: ` <br />Basic Services During Bidding Phase: The Bidding Phase will commence upon the approval by <br />the Client of the Contract Drawings and Project Manual and will terminate upon URS furnishing the <br />Client with an engineering recommendation concerning the awarding of the construction contract. <br />URS' services during the Bidding Phase shall consist of the following: <br />1. URS shall issue on behalf of the Client up to 40 sets of Drawings and Project Manuals to <br />interested Contractors and equipment and materials suppliers upon their request and maintain <br />records of the bidders list. URS shall be entitled to charge the Contractor's, suppliers and <br />other interested parties a reasonable fee for purchase of the Drawings and Project Manuals <br />and will retain such fee as additional compensation. <br />2. URS shall place copies of the Drawings and Project Manual on view in URS' Cleveland <br />office, F.W. Dodge offices, and others as necessary for information of Contractors and <br />equipment and material suppliers; and be available for interviews with prospective bidders <br />during period of advertisement for construction bids. <br />3. URS shall issue Addenda as required during.the bidding period. <br />J:1ProposalsUvlazketing\Contracts\Ivlayfield 10-50907.00\W06_MOD10.doc
The URL can be used to link to this page
Your browser does not support the video tag.