My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/20/2006 Meeting Minutes
DOcument-Host
>
Mayfield Village
>
Meeting Minutes
>
2006
>
03/20/2006 Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2019 9:27:35 AM
Creation date
7/18/2018 6:24:55 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Meeting Minutes
Date
3/20/2006
Year
2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1VIINUTES OF THE REGULAR 1VIEE'I'ING OF COUNCIL <br />March 20, 2006 - 8:00 p.m. <br />MAYFIELD VILLAGE CIVIC HALL <br />The Council of Mayfield Village met in regular session on Monday, March 20, 2006 at <br />approximately 8:05 p.m. in the Mayfield Village Civic Hall. Council President Buckholtz called <br />the meeting to order. <br />ROLL CALL: Present: Mr. Buckholtz, Mr. Marquardt, Mr. Marrie, <br />Mr. Saponaro, Mrs. Mills and Dr. Parker (8:25 p.m.) <br />Absent: Mrs. Cinco <br />Also Present: Mayor Rinker, Ms. Calta, Mr. Chapman, Chief Dearden, <br />Chief Mohr, Mr. Marrelli, Mr. Metzung, Mr. Thomas, <br />Mr. Cappello and Mrs. Betsa <br />The Pledge of Allegiance to the Flag was given. <br />OPEN PORTION <br />5-minute limit imposed by Chair. Those who wish to speak must first state their name and address. <br />There were no comments. <br />Comments by URS Representative - Gregorv A. Rhinehalt, Senior Environmental Scientist <br />Mr. Rhinehalt commented upon the proposal submitted for services related to the wetland <br />and stream mitigation monitoring for the State Route 91 proj ect. They submitted and obtained <br />pemuts for the wetland stream associated with the State Route 91 project on behalf of the Village. A <br />condition of those permits was to replace wetlands and streams that were affected by the project <br />including the bike path. They completed on-site mitigation as well as sma11 isolated wetlands <br />constructed on the North Chagrin Reservation. A condition of the plan is to provide five years of <br />monitoring including field work and a report at the end of each year for a total of five years. <br />Beginning within the last year, Ohio EPA has significantly increased the requirements of the <br />monitoring including soil and water chemistry, vegetation and sampling. That in a nutshell is what <br />URS has proposed to do. They could not anticipate the requirements at the time they originally <br />proposed the project. It was not part of the scope of the work. <br />Mr. Saponaro indicated that Mr. Rhinehalt came before the Finance Committee. He also <br />explained to us that there are some new rules that are applicable, both Federal and Ohio which is a <br />liitle more stringent. This would include two site visits per year and an annual report. After five <br />years, URS will make sure that we have complied with everything and provide final approval. This <br />is not only the waterfalls by the Hejcl property, but this is Beecher's Brook, the street by Progressive <br />and more stringent monitoring of water and soil chemistry and vegetation density. These are all
The URL can be used to link to this page
Your browser does not support the video tag.