Minutes of the Combined Caucus/Council Meeting <br />7-16-07 <br />Page 2 <br />DEPARTMENT HEAD REPORTS: <br />SERVICE - Douglas Metzun? <br />Mr. Metzung will defer the Metro Park and Highland Road sewer projects to Mr. Cappello for <br />report. The Service Department is progressing with work in the Worton Park area where they <br />are putting the stonework and the arches over the culverts in that area. The inside of the north <br />tunnel has been painted. If you get a chance, walk through there. They tried to fill all of the gaps <br />in the pipe. The material kept falling out. They did go ahead and paint the inside. That has made <br />a tremendous improvement, just in having the light beige colored paint. It really takes the marks <br />off the wall and cleans it up, makes it look very nice. We are certainly getting our money's <br />worth from this year's hydrant permit. We have been watering fairly non-stop on the soccer field <br />areas. Right now, they are working on overseeding and putting a cover over that for the couple of <br />weeks we have. When that begins again in September it will hopefully be beautiful and green. <br />Speaking of the drought, we have many many trees that are very stressed and look very poor. <br />These are the trees that were planted between three and five years ago. We are concerned with it. <br />A call has been placed to Mr. Siewart from the Urban Ohio State Natural Resources. He is out <br />until Thursday. Mr. Metzung speculates it is just drought-related. Mayor Rinker asked if they <br />are being watered. Mr. Metzung replied that we are watering mostly just the newly-planted <br />trees. Attempting to water all 700 plus trees is out of our realm. <br />BUILDING T John Marrelli <br />Mr. Marrelli reported that back in May, they did a survey around the Village of properties and <br />handed out some 45 courtesy warning notices. As of last Friday, all 45 axe either completed or <br />nearly 99% complete. Mr. Marrelli expressed his thanks for taking the warnings seriously and <br />making the needed repairs. <br />ENGINEERING - Tom Capnello <br />Updating on the sanitary sewer project on Metro Park and Highland Road, Mr. Cappello reported <br />that Metro Park Drive is completed with the exception of a final walk through. Mr. Cappello and <br />Mr. Metzung will be walking through to tally any punchlist items and minor items that need to <br />be addressed. Otherwise, everything is complete. The Highland Road sanitary sewer will be <br />inspected by the Cuyahoga County Sanitary Engineer this Wednesday. Once that approval is <br />received from the County, we will then be able to write a letter to the residents informing them <br />they are able to tie in both on Metro Park and Highland Road. Obviously the restoration of <br />Highland is still not done but we can still begin tying in the connections. Also, as you probably <br />noticed, excavation for the hike and bike trail underpass has begun. It began last week. There is <br />one lane closure signalized on Highland Road. That is expected to last approximately 5 more <br />weeks. They will be able to get that section done and when we reopen the road we should be <br />able to go back to two way traffic. We went with this method to maximize the amount of culvert <br />that can be built so that when they do switch over to build the other side it is done in two stages <br />so we are able to have two way traffic and there is no need for any more delays. It is his