Laserfiche WebLink
Minutes of the Special Meeting of Council <br />Monday, February 6, 2012 <br />Page 2 <br />It's really sort of an upgrading of the existing facility as it is now. Rea11y there's not a lot of <br />changes in terms of layout or organiza.tion of it. I will start in the front and move back and just <br />explain the scope of what's happening with this project. <br />The vazsity baseball field is in this location and there's nothing happening with that portion of <br />the project. It will remain there. Currently, or actually before construction started on the High <br />School which is ongoing now, there was a softball field that was located right here. In this plan, <br />that softball field is going to be relocated over where there's a practice field now. Improvements <br />will be made on this. The entire infield will be redone with fencing. Drainage will be improved. <br />There's some drainage problems that happen along the west side of tha.t property. Dugouts will <br />be constructed similaz to the varsity baseball field currently. The relatively new scoreboazd that <br />was there on the field will be relocated there. There will be improvements to that portion of the <br />baseball field. There will be additional pazking located here. It's part of what we call phase 2. <br />Phase 1 is what will be undertaken immediately. There aze a couple of portions of this that <br />because of funding won't be able to happen under phase 1 but will be happening u.nder phase 2. <br />The completion of the parking lot will be part of that phase 2. What will ha.ppen at the end of <br />phase 1 is that this will be a11 gravel, a gravel surface, that will be parka.ble and usable but not <br />asphalt surface. Phase 2 would put that finished surface on there. <br />Part of the cunent project on the High School is there will be a continuation of the driveway <br />behind the school. Currently you get in the parking lot on the east and it sort of ends and the <br />loop drive which serves the excel tech in the rear of the building, those will be connected with a <br />driveway through that. There will be a new stormwater management retention structure that will <br />be in that location there. <br />As we move in to the field then in general, the grass field will be replaced with an artificial turf <br />field which will accommodate both football and soccer. The track will be essentially located <br />where it is now. The surface will be taken off of that and a new latex surface placed on the track. <br />The fencing will be reworked and everythi.ng that's inside this azea will either be athletic surface <br />which is the darker gray or asphalt which is the lighter gray so there won't be any necessary <br />reason for grass cutting inside the fence. It will a11 be artificial surface. <br />The bleachers are going to be replaced with the same number. It's approximately 2,500 that the <br />bleachers seat currently. These will be brand new bleachers with 2,500 seats, 500 of which will <br />be actual seats so they will be looking to rent those. They will be leasing the seats in the middle. <br />The remai.nder will be benches. <br />At the front there will be a new entry gate. You can see the rendition of it down here, but there <br />will be new entry buildings which include a ticket booth, toilet rooms and a concession stand. <br />Again, as a part of phase 1, we will be building these three on the west side and including the <br />entry gate which you see in this rendition which is these buildings and the entry gate in the <br />middle. With phase l, there will not be any buildings on the other side, but that will be a phase 2 <br />thing where they will come back and add the other three buildings which are identical, again a <br />ticket booth, toilet room and a concession stand on the other side. It gives a little better sense of <br />entry into the stadium compared to what it is now.