My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/21/2014 Meeting Minutes
DOcument-Host
>
Mayfield Village
>
Meeting Minutes
>
2014
>
07/21/2014 Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2019 9:28:59 AM
Creation date
7/24/2018 5:39:55 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Meeting Minutes
Date
7/21/2014
Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Minutes of the Regular Meeting of Council <br />Monday, July 21, 2014 <br />Page 14 <br />• First Reading of Ordinance No. 2014-19, entitled, "An Emergency Ordinance <br />determining to proceed with the improvement of Eastgate Drive and Meadowood Drive <br />between certain terinini by constructing sanitary sewers, sanitary sewer service <br />connections and manholes, installing, where necessary, force mains and storm sewers, <br />and replacing, where necessary, pavement and driveway aprons, all together with the <br />necessary appurtenances thereto." Introduced by Mayor Rinker and Council as a Whole <br /> <br />Mrs. Mills, seconded by Mr. Marquardt, made a motion to suspend the rules of Council <br />requiring an Ordinance to be read on three separate occasions. <br />ROLL CALL: AYES: All <br />NAYS: None <br />Motion Carried <br />Rules Suspended <br />Mrs. Mills, seconded by Mr. Marquardt, made a motion to enact Ordinance No. 2014-19. <br />Council President Pro Tem Marrie asked, any question or comments? <br />Mr. Jerome aslced, the roadway, is that going to be any wider than it is now? <br />Mr. Cappello replied, the plan is not to. It will be fully recycled, somewhat like Seneca <br />and Metro Park and Highland Road. There will be another 3 inches of asphalt on top. The <br />sewer will be replaced outside the pavement. They will have connections that will require <br />an open cut. Those get patched. They will come in and grind the first top 6 inches of the <br />entire roadway. It gets injected with a cyclogen. <br />Mr. Metzung added, they rebuild the roads. It gets more glue. <br />1VIrs. Eisenberg asked to comment. I live on Seneca. Make the road a little wider. If <br />there's a truck and school bus, the school bus backs up. That is absolutely wrong. Make it <br />a little bit wider. It's ridiculous for a school bus to back up. <br />Mr. Cappello stated, Seneca is only 18 feet wide. Eastgate and Meadowood is 20. There's <br />an extra 2 feet on that road. <br />Mrs. Eisenberg stated, make it wider than that. It's ridiculous. We have trucks going up <br />and down our street. When that school bus backs up, I am absolutely furious. There's no <br />excuse for that. <br />ROLL CALL: AYES: All Motion Carried <br />NAYS: None Ordinance Enacted
The URL can be used to link to this page
Your browser does not support the video tag.