Laserfiche WebLink
<br /> <br /> <br />Minutes of the Special Meeting of <br />Planning and Zoning, Council, Architectural <br />Review Board and Citizens Advisory Committee <br />Page 7 <br />south. The northern room would be a little smaller. You could have an event in there and <br />people can go outside. Similarly on the south side, ditto. You are coming out on the lawn. <br />The basic idea is try to look at flexible ways that can work in one or a few pieces. <br />Q: How would the ceiling heights be in comparison to the existing facility? Along with that, <br />what kind of finishes? <br />A: As far as the ceiling height goes, it is going to be much easier for us to get higher ceiling <br />heights. <br />Q: 10 feet? <br />A: We are thinking like 12-14 for the main space, but maybe 10 throughout. <br />Q: What is the existing?~ <br />A: 9 %Z maybe 10 to the existing. As far as finishes go, both plans can easily have the same <br />finishes. When we did the price comparisons, we looked at that. <br />Q: Upper scale or basic? <br />A: Honestly, we have not gotten that far. It's tough to say what's upscale. <br />Mayor: The idea is we don't need to go over the top. We don't need the extravagant. A hearty board <br />can be used for a surface as opposed to wood or cedar. Something durable. The goal would <br />be that if we are going to invest more dollars in this, we want to do an investment that is going <br />to stand the test of time. By building new, the chances are greater that you can put good <br />quality in without being extravagant and then you have something that is going to wear well <br />for a longer period of time so that it is lower overhead over time. <br />A: The other thing nice about the new construction is that we can address energy efficiency in <br />building the walls with the new science and technology we have whereas the existing building <br />has siding which is actually on brick. There are some difficulties there when you start looking <br />at where things should go. If we just go and plat it on the outside, we may actually be moving <br />the dewpoints in the wall. There could be extra costs to do it correctly. <br />Q: As active as the women's organizations and other organizations are, we need storage. There <br />doesn't seem to be very much storage on this. Ladies have a lot of treasures like our coffee <br />pots and things like that. <br />A: Ron shared that with us. We understand that part. The part of providing the programming <br />required is the next step. If we are to go with new or renovate the existing, we have to solve <br />both those problems. <br />