My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/24/2005 Meeting Minutes
DOcument-Host
>
Mayfield Village
>
Meeting Minutes
>
2005
>
10/24/2005 Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2019 9:30:28 AM
Creation date
7/24/2018 8:35:00 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Meeting Minutes
Date
10/24/2005
Year
2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Regular Council Meeting <br />10/24/05 <br />Page 16 <br />Mr. Buckholtz asked for an explanation. Mr. Metzung indicated that this is the north tunnel <br />which experienced three blocks that were set low. They held water. Great Lakes Construction, in <br />an effort to correct that problem, was going to pave the area. Mr. Metzung asked that the whole <br />box be paved because the floor of the box would have been very slippery had it just been left in <br />its concrete state. The cost of the $5,000 is being shared. We are paying approximately $4,000. <br />They are paying approximately $1,000.00. It is $880 something I believe. <br />Mr. Buckholtz asked if they were repairing what they did wrong and if we are paving the whole <br />thing. Mr. Marquardt asked if this was for the extra paving. Mr. Saponaro indicated that we had <br />approved a certain material to be used. Looking back, we determined it was not the best because <br />it was very slippery and there is foot traffic. Something needed to be done in order to make it <br />safe. This is the remediation to it. In essence, they did not do anything wrong. Mr. Marquardt <br />asked how this tied in with the blocks being too low. Mr. Metzung indicated that they had <br />several blocks that they needed to correct because they held water, so they worked it together so <br />that they paid for their low blocks that were holding water and we paid for the rest. Mr. <br />Saponaro added that in the aggregate you are going to get a better price for it if you put two <br />projects into one. <br />Roll Call: AYES: All <br />NAYS: None Motion Carried <br />Expenditure Authorized <br />Before moving along to the next motions, Mrs. Mills advised that Mrs. Cinco will provide an <br />explanation of the meeting that will be November 1St. The next items are in reference to the <br />drainage and infrastructure problems. <br />The meeting is at 7:00 p.m. November 1St for all effected residents and their neighboring <br />residents. The Committee will be there, Mr. Cappello, Mrs. Cinco, Mr. Marrelli and Mr. <br />Metzung. <br />Mr. Buckholtz stated for the record that everyone signs off on these projects. Mr. Metzung <br />responded that everyone signs off to allow us to enter their property to assess and look over the <br />projects. He does not know if the form gives final approval for us to actually enter their property <br />and do the work or to be subject to help pay for it. Mrs. Cinco advised that those forms will be <br />available that night for the residents. There is language in the forms that discusses it. Mr. <br />Metzung does not know if the original form discusses the payment and things of that nature. <br />That is why there will be a meeting, to get everyone together and go through this. The new form <br />gives final approval. Mr. Buckholtz indicated after this meeting we will get everyone's <br />authorization and approval to move forward with these projects. Mrs. Cinco added their <br />cooperation and payment. This is something that we said we would do for the residents <br />originally. It worked out very well. <br />Mr. Buckholtz asked if everyone will be notified. Mrs. Cinco indicated that letters are going out <br />tomorrow morning. Mr. Buckholtz asked what happens if someone does not attend that meeting <br />and we need to move ahead with that project. Mrs. Cinco said we will go to get their signature. <br />Mrs. Cinco. hopes that the applicant will be responsible to go to that meeting, much like Ted <br />
The URL can be used to link to this page
Your browser does not support the video tag.