My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022 18 ORDINANCE
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
2022 Ordinances
>
2022 18 ORDINANCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2023 8:24:19 AM
Creation date
3/6/2023 5:55:14 PM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Ordinance
Number
2022 18
Date
10/17/2022
Year
2022
Title
CHAPTER 1128 COMPREHENSIVE STORMWATER MANAGEMENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ORDINANCE NO. 2022-18 <br />Page 23 <br />b. Less than one (1) acre of lots remain unbuilt. <br />No development activities have occurred for one (1) year. <br />An As -Built Certification of all SCMs is approved by the Village <br />Engineer. <br />An Inspection and Maintenance Plan has been approved by the Village <br />and Inspection and Maintenance Agreement has been signed by the <br />developer, the contractor, the Village, and the private owner or <br />homeowners' association who will take long term responsibility for these <br />SCMs, is accepted by the Village. <br />B. Once these criteria are met, the applicant shall be reimbursed all bond monies that <br />were not used for any part of the project. If all of these criteria are not met after <br />three (3) years of permanent stabilization of the site, the Village may use the <br />bond monies to fix any outstanding issues with all stormwater management <br />structures on the site and the remainder of the bond shall be given to the private <br />lot owner/ homeowners association for the purpose of long-term maintenance of <br />the project. <br />1128.16 INSTALLATION OF WATER QUALITY STORMWATER CONTROL <br />MEASURES <br />The applicant may not direct runoff through any water quality structures or portions thereof that <br />would be degraded by construction site sediment until the entire area tributary to the structure <br />has reached final stabilization as determined by the Village Engineer. This occurs after the <br />completion of the final grade at the site, after all the utilities are installed, and the site is <br />subsequently stabilized with vegetation or other appropriate methods. The developer must <br />provide documentation acceptable to the Village Engineer to demonstrate that the site is <br />completely stabilized. Upon this proof of compliance, the water quality structure(s) may be <br />completed and placed into service. Upon completion of installation of these SCMs, all disturbed <br />areas and/or exposed soils caused by the installation of these practices must be stabilized within <br />two (2) days. <br />1128.17 VIOLATIONS <br />No person shall violate or cause or knowingly permit to be violated any of the provisions of this <br />regulation or fail to comply with any of such provisions or with any lawful requirements of any <br />public authority made pursuant to this regulation, or knowingly use or cause or permit the use of <br />any lands in violation of this regulation or in violation of any permit granted under this <br />regulation. <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.