My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024 031 RESOLUTION
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
2024 Resolutions
>
2024 031 RESOLUTION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2025 12:45:41 PM
Creation date
5/24/2024 9:31:40 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Resolution
Number
2024-31
Date
5/20/2024
Year
2024
Title
ALL COVERED-FORTINET WIFI
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RESOLUTION 2024-31 <br />Page 2 <br />and any additional time and/or materials needed to provide a complete solution will <br />be quoted in project Change Order. <br />• All systems within the scope of this engagement must be in proper working order. <br />Steps taken to remediate systems not in a `healthy' state will be considered <br />outside the scope of the engagement. <br />• Any system(s) being affected by the project have adequate backup and <br />restoration capabilities and the appropriate precautions have been taken. <br />• All necessary security clearance, access, parking, passwords, and <br />technical resources are provided without delay during the Engagement. <br />• Access to power and physical facilities, wiring, cable space, cabinet, and shelf <br />or rack space are available for all equipment within the scope of this project. <br />• Client is responsible for providing a single point of contact for project <br />coordination with All Covered. <br />• Client is responsible for providing timely clarification and resolution regarding <br />the integrity of data/information supplied to All Covered. <br />• If the information presented to All Covered is found to be inaccurate, we reserve <br />the right to initiate a change order to account for the extra services not <br />incorporated into the proposal. <br />• The existing cabling will be reused. <br />• The existing PoE switches will be reused. <br />• The client is responsible for cabling, mounting and dismounting of the existing <br />and new access points. <br />• The client stated no issues with current wireless, so replacing the current APs <br />in their current location is in scope. <br />(v.07.2021) Confidential <br />Project Deliverables <br />The desired goals of this project are: <br />• Procurement of items listed within Cost estimate section enabling <br />successful completion of scope provided by this Statement of Work. <br />• An engineer will review the current wireless environment configuration to be <br />used for reference. <br />• An engineer will review the project with the client for their requirements as <br />it pertains to the scope of work. <br />• An engineer will deploy and configure the Cloud Management Portal for <br />the wireless environment. <br />• The access points will be added to the portal and configured based on the <br />existing configuration. <br />• The access points will be tested for functionality and connectivity. <br />• The new hardware and wireless environment will be documented. <br />Pre -Project Tasks <br />Project Planning, Procurement, Ensure equipment arrival, Initial project kick-off <br />Project Tasks <br />[Project Discovery and Review] <br />
The URL can be used to link to this page
Your browser does not support the video tag.