Laserfiche WebLink
ORDINANCE N0. 84-33 <br />INTRODUCED BY: Mayor Carmen & Council as a Whole <br />AN ORDINANCE AMENDING CERTAIN <br />SECTIONS OF CHAPTERS 971, 1305 AND <br />1309 OF THE CODIFIED ORDINANCES OF <br />MAYFIELD VILLAGE, OHIO, PERTAINING <br />TO FEES FOR PERMITS, CONTRACTORS <br />AND INSPECTIONS, REPEALING ALL <br />ORDINANCES INCONSISTENT THEREWITH <br />AND DECLARING AN EMERGENCY. <br />BE IT ORDAINED BY THE COUNCIL OF MAYFIELD VILLAGE, OHIO, THAT: <br />Section 1~ Effective July 1, 1984, Section 971.10 of <br />Chapter 971, dealing with alarms, is hereby amended to read as <br />follows: (Deleted material appears like ~i~~s and new material <br />appears like THIS) <br />971.10 Permit Required; Fee. <br />A permit from the Building Department shall be required <br />before the installation of any alarm covered by Section 971.03. <br />Each permit application shall be accompanied by a fee of-~er~ <br />~3o-1-l~r-s--(~-1-0-.-0-(}-) TWENTY FIVE DOLLARS (525.00) for an alarm <br />system in a residential premises and T-w-erg-t-~=~r~e-I~o-l-1-~~~ <br />(-52r.-0.0-) FIFTY DOLLARS ( 550.00 ) for an alarm system in all <br />other premises. For purposes of this Section, a permit <br />application for the installation of an alarm system connected <br />to both the Police Department and Fire Department shall <br />require only one permit fee if 'both alarms are to be installed <br />at the same time thereby requ~ir~ng only one inspection under <br />Section 971.03(c). <br />Section 2. Effective July 1, 1984, Sections 1309.04(a) <br />and (b) and 1309.05 of the Codififed Ordinances of Mayfield Village, <br />Ohio, pertaining to permit fees, shall be amended to read as follows: <br />(Deleted material appears like tuts and new material appears <br />like THIS) <br />1309.04 Lump Sum Permit Fee; Exceptions. <br />(a) Single-Family Dwellings. For construction of a <br />new single family dwelling house, a total lump sum permit fee <br />of 2'v~o-~rrd-rid-~o-l-l~r~--(~-X0.0--0-0-~ THREE HUNDRED DOLLARS ( 5300 .00 ) <br />shall be charged for all permits issued pursuant to the original <br />plans as approved. This will include the cost of all permits <br />issued for construction, original heating and air conditioning, <br />