My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1976 005 Ordinance
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
1974-1976 Ordinance
>
1976 005 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 3:56:34 PM
Creation date
8/9/2018 11:53:36 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Ordinance
Number
005
Date
1/19/1976
Year
1976
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ordinance No. 76- 5 <br />Introduced by: Mr, Schulte <br />AN ORDINANCE PROVIDING FOR THE EMPLOYMENT OE <br />AN ENGINEER FOR MAYFIELD VILLAGE <br />THAT: <br />BE IT ORDAITIED BY THE COUNCIL OF MAYFIELD VILLAGE, CUYAHOGA COUNTY, OHIO, <br />Section 1. Stephen Hovancsek is hereby employed and appointed as Engineer <br />for Mayfield Village, Ohio until December 31, 1976, such employment to be terminable <br />by either the Village or said Engineer upon 90 days written notice to the other. <br />However, all work, if same is being processed in a manner satisfactory to the Village, <br />sha11 be completed by the Engineer and the services therefor paid by the Village, in <br />accordance with the terms hereof. <br />Section 2. Stephen Hovancsek shall be compensated as follows, and the <br />Mayor and the Clerk are hereby authorized to enter into an Agreement in writing with <br />said Stephen Hovancsek whereby he will be paid on the following basis: <br />(a) If the proceedings for any improvement are completed according to the <br />usual schedule, as provided by law, so that the bids are received and a contract is <br />awarded, he shall be paid a sim equal to seventy-five percent (75%) of the amount <br />listed in Sec. 2(b); as the work progresses, he shall receive additional compensation <br />equal to the balance of the fee listed in Sec. 2(b); said sum to be paid at the time <br />the contractor's estimates, upon which his payment is based, are presented for payment. <br />Before the final estimate for the work is issued, any adjustment shall then be made <br />so that the total fee paid him shall be equal to the percentages listed in Sec. 2(b). <br />(b) That for such services in connection with construction of public improve- <br />ments, he shall receive compensation on a percentage for the actual cost of construction <br />of all improvements made by council or under their control. The percentage paid shall <br />be in accordance with the following schedule, based upon the Minimum Fees for General <br />Engineering Services recommended by the Ohio Society of Professional Engineers in their <br />publication, "Code of Professional Practice", as revised in 1967. <br />General Engineering Projects - Schedule 1 <br />Airports and Facilities <br />Bridges and Grade Separation Structures <br />Foundations <br />Dams and Hydraulic Structures <br />Highways and City Streets <br />Incinerators <br />Intercepting, Relief, Storm or Sanitary Sewers <br />Outside Electrical Installations <br />Power Plants <br />Pumping Stations <br />Railway and Bus Terminals <br />Electrical Transmission and Distribution Facilities <br />
The URL can be used to link to this page
Your browser does not support the video tag.