Laserfiche WebLink
?? . <br /> <br />To: Mayor Rinker <br />Council President Buckholtz <br />All Members of Council <br />From: ghil Breti`-J;W <br />Reference: URS modification #10 <br />June 25, 2004 <br />Please find attached modification number 10 for URS contract in conjunction with the <br />S.O.M. Center Road widening project. URS lays out the specific needs far the changes <br />in the attached documentation. In addition, URS has provided a comparison of some of <br />the cost savings that have been achieved relative to some of the increases in the cost of <br />engineering. Please note that for construction engineering, the savings achieved far <br />exceed the additional cost of engineering. <br />The additional cost of construction observation reflects the desire by the Village to <br />provide the optimal degree of inspection and oversight on the actual construction phase <br />of engineering. This is critical to the long term issues of quality control and fiscal <br />control. The presence of sufficient qualified inspectors on the jah in the past has prczve.d <br />critical on a number of projects. The absence of the same on other projects has resulted <br />and a host of problems. I have asked theLaw Department to draft the necessary <br />legislation for Monday and respectfully ask Council to consider and approve the <br />legislation. Please feel free to contact me with questions an this issue.