Laserfiche WebLink
ARCHITECTURAL BOARD OF REVIEW <br />JUNE 22, 1988 PAGE 3 <br />bulkhead (brick wi11 match existing brick on mall). They will install <br />one air conditioning unit behi-nd the parapet where other units are <br />located. B. Zergott moved to accept the T.G.I. Friday's proposal as <br />submitted showing a 30 inch highbuttress, seconded by T. Gallagher, <br />and unanimously approved. <br />VIo ADJOURMENT: <br />The meeting was adjourned at 6;15 p.m. <br />B. Zergott, Acting Chairman B, Oring, Clerk of Commi.ssions