Laserfiche WebLink
constructed as a residence. In response to the members' questions, Mr. Predota <br />, advised that there would be 175 to 200 feet from the back of the proposed <br />. building to the rear property line. Mr. Skoulis questioned if the 5 feet <br />between the corner of the building and the adjacent property conformed to <br />code. Mr. Conway responded that the current commercial codes required that the <br />building be either right on the property line or 5 feet away. The new codes <br />require a larger setback. He further stated that the Law Department ha.d <br />advised that any proposal that is initially brought to the Commission while <br />the old code is in force is reviewed and approved tmder the old code. <br />Assistant City Engineer McDermott stated that a portion of the building sits <br />over a previously approved drainage system and would have to be adjusted or <br />protected. Mr. Predota will install a steel pipe in that area. He explained to <br />Mr. Orlowski that at present an access door and an overhead door are planned <br />only for the front, however, he is considering door on the side as well. A. <br />Skoulis moved to forward this proposal to the Architectural Review Board, to <br />Safety and Engineering, seconded by J. Thomas, and unanimously approved. <br />1) Butternut Ridge Apartments, property located south of I-480, west of S.R. 252, <br />and north of lots facing Butternut Ridge Road. <br />Proposal to construct apartment complex. <br />(Different proposals for same property previously approved by Planning <br />Commission tmder the name of Steeple Walk on December 12, 1989 and later on <br />October 23, 1990). <br />Mr. Trevillian, representing Summit properties, explained they are proposing a <br />substitute._plan for those that were previously approved for this property. Mr. <br />Furman, architect, explained that their philosophy is that apartments should <br />be distinctive comrm,n-ities, and have explored ways to develop them. He <br />presented slides of some of their other projects, as well as some showing the <br />normal, back to back, side to side type of buildings. They attempt to cluster <br />their building so that the units are away from the parking lot, and so that <br />the maximum number are oriented toward a common space or court yard. He <br />showed the plan for the previous proposal pointing out that these builclings <br />were all over 200 feet, back to back, and oriented to the parking lot with <br />detached garages. In their complex half of the garages are incorporated <br />within the building, and the majority of the units are oriented away from the <br />parking lots with a few imits oriented to the court yardse The site plans are <br />similar in that the circulation will be on the north side of the site, and the <br />buffers will be maintained on the south. The clubhouse, with heavy <br />landscaping, will be at the entry and parking will be located behind it. The <br />elevations of the buildings conform to the code and are massed so that the <br />tallest portion of the building is in the middle with the remainder being <br />stepped down to one and two stories. The overall length of the buildings would <br />vary from 140 to 160 feet, and the buildings will be stucco with stucco <br />chimneys, wood clapboard siding with wood trim. In response to questions, Mr. <br />Trevillain explained that they now own about 70 apartment complexes and have <br />only sold four or five of their developments. Their parent company has been in <br />business since 1972, but their real growth started in 1982 when they <br />introduced these new concepts. Mr. Thomas questioned why this development <br />would be feasible for their company when two other companies could not get <br />financing. He is concerned that they, too, might back out. Mra Trevillian <br />speculated that these developers were unable to get financing becaus.e of the <br />savings and loan problems, and that their projects were financed through life <br />insurance companies and pension funds. He stated that they have made <br />feasibility studies and are confident tha.t they will continue; however, they <br />3