My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/27/1993 Minutes
Document-Host
>
City North Olmsted
>
Boards and Commissions
>
1993
>
1993 Planning Commission
>
04/27/1993 Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 12:32:22 PM
Creation date
1/29/2019 7:17:44 AM
Metadata
Fields
Template:
N Olmsted Boards & Commissions
Year
1993
Board Name
Planning Commission
Document Name
Minutes
Date
4/27/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
qRdund ound, Inc. 35 Braintree Hill Office Park TEL (617) 380-3100 <br />P.O. Box 9078 • Braintree, MA 02 1 84-907 8 FAX (617) 380-3168 <br />Apri123, 1993 <br />Ms. Billie Oring <br />Planning Department Secretary <br />CITY OF NORTIi OLMSTED <br />5200 Dover Center Road <br />North Olmsted, OH 44070 ' <br />Re: The Ground Round Restaurant <br />24250 Lorain Road <br />Dear Ms. Oring: <br />I have spoken with Mr. Bruce Weekly of Venture Construction this date regarding the above noted. <br />I have enclosed our latest color selection modification pertaining -to the exterior color. I trust this color <br />which replaces the "yellow" will meet with board approval. <br />Regarding the other items discussed, I offer the following: <br />A.) We will utilize a satin or semi-gloss finish on the paint as opposed to the high gloss finish. <br />B.) The southwest corner of this parcel and the areas at the front entry and ground signage <br />will be re-landscaped as a part of this remodeling. We have not developed individual <br />landscape drawings for each Ground Round Restaurant site. Please bear in mind it is in <br />our best interest to improve our streetscape appearance and fully intend to do so. <br />C.) We will have our general contractor re-construct the existing dumpster enclosure to <br />accomodate all of our trash containers. <br />We look forward to receiving board approval this Tuesday evening, April 27, 1993. <br />Should you have any further questions or concerns, please do not hesitate to call me at 617-380-3131. We <br />are most anxious to commence with the upgrading of this facility. <br />cc: Venture Construction <br />D. Eisenmann
The URL can be used to link to this page
Your browser does not support the video tag.