My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/17/1983 Minutes
Document-Host
>
City North Olmsted
>
Boards and Commissions
>
1983
>
1983 Architectural Review Board
>
08/17/1983 Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 12:34:31 PM
Creation date
1/30/2019 6:47:36 AM
Metadata
Fields
Template:
N Olmsted Boards & Commissions
Year
1983
Board Name
Architectural Review Board
Document Name
Minutes
Date
8/17/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. <br />'• ARCHITECTURAL BOARD OF REVIEW AUGUST 17, 1983 <br />PAGE 2 <br />questioned the width of the 40 foot drive between the off ice tower <br />and parking structure since this would seem to be a tunnel-like <br />access. Mr. Ebin suggested some type of recessed treatment of the <br />buildings which would alleviate this problem. Board also believed <br />that the two large parking structures facing Brookpark Rd. would <br />have no curb appeal from Brookpark. These could be rearranged <br />later. Mr. Mongello questioned if parking and stacking area for cars <br />exiting parking structures would be adequate, and what traffic controls <br />would be instituted. Parking exceeds code and traffic study has been <br />made; no signalization has been planned for phase one; and traffic <br />situation will be restudied with each phase of the complex and <br />signalization planned at that time. Board suggested that an over- <br />head passageway from parking structure to hotel and overhead trans- <br />portation to the Mall should be included in plans. S. Ebin moved to <br />approve the detailed development plans for the Great Northern Cor- <br />porate Center with the disapproval of the long narrow 40' wide drive <br />between the parking structure and the office tower which should be <br />restudied and re-presented and that exiting traffic stacking area <br />be restudied for adequacy and re-presented to the Architectural <br />Board, seconded by R. Mongello. Roll call on motion: Ebin, Mongello, <br />and Case, aye. Cavaluchi, riay. Mr. Cavaluchi explained that his no <br />vote was because the project is so complex in its enormity that there <br />are certain things that he would prefer to study prior to his ap- <br />provalo He would like more time to study proposal. Mr. Richland stated <br />that the plans would be returned for study at each phase of the con- <br />struction. <br />Mr. Mongello questioned Mr. Richland as to why screening had not <br />been installed on the Pick and Pay building. Mr. Richland stated <br />that screening would be installed next week. <br />VI. ADJOURNMENT: <br />The meeting was adjourned at 5:30 p.m. <br />M. Case, Chairwoman B. Oring, Recording Secretary
The URL can be used to link to this page
Your browser does not support the video tag.