My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/03/1982 Minutes
Document-Host
>
City North Olmsted
>
Boards and Commissions
>
1982
>
1982 Planning Commission
>
05/03/1982 Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 12:34:37 PM
Creation date
1/30/2019 7:12:58 AM
Metadata
Fields
Template:
N Olmsted Boards & Commissions
Year
1982
Board Name
Planning Commission
Document Name
Minutes
Date
5/3/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
? . r , . <br />J ' <br />CITY OF NORTH OLMSTED <br />PLANNING COMMISSION <br />SPECIAL MEETING <br />MINUTES - MAY 3, 1982 <br />I. ROLL CALL: <br />Chairman Gorris call.ed the meeting to order at 7:00 p.m. <br />Present: J. Burns, T. Morgan, R. Perla, J. Roberts, J. Brown, <br />and B. Gorris <br />Absent: J. Prokasy <br />II. REVIEW AND CORRECTION OF MINUTES: <br />The Minutes of April 27, 1982 were not available for approval. <br />III. BUILDING DEPARTMENT REQUESTS: <br />Special Hearing continued from April 27, 1982: <br />Pick '.n Pay Food Palace, Great Northern Plaza (north side of <br />main Drive, east of Putt Putt Miniature Golf-Course) <br />Proposal to construct grocery store. <br />Chi Chi's Restaurant, Great Northern Shopping Plaza (north <br />side of main drive, west of Putt Putt Miniature Golf Course). <br />Proposal-to construct restaurant. <br />Revised plans for *he sidewalks:and walkways had been-distri- <br />buted to the-members prior to the meeting. Mr. Richland and <br />Mr. Rake,.representing the developer, explained that the side- <br />walk along Lorain Rd. will.be replaced.by a new sidewalk to <br />permit access to the RTA stop and will be extended 'south at <br />the present crosswalk to provide a path to the paved area <br />running parallel to Brookpark Rd. The sidewalk will be con- <br />crete and the walkway through the parking_lot will be asphalt.. <br />and not raised. A pedestrian access from the existing Plaza <br />on the south to the new section on the north is not being <br />planned at this time. It was pointed out that access to all <br />stores in the mall and in other shopping centers was through <br />the parking area, and such a raised sidewalk would cause pro- <br />blems with maintenance and parking. The walkway planned to <br />Pick 'n Pay runs behind the parking area which is adjacent to <br />Brookpark Rd. Mr. Richland pointed out that this is,employee <br />parking and will not be an in and out situation. After some <br />discussion it was agreed that the-walkway behind the parking <br />spaces would be moved as close to the building as possible <br />and would be marked in some way to define it. A sidewalk on
The URL can be used to link to this page
Your browser does not support the video tag.