Laserfiche WebLink
9 <br />BOARD OF ZONING APPE[1LS AUGUST 17, 1981 PAGE 2 <br />that he needed a variance and due to an error in the office the <br />construction was started before the building permit was issued. <br />There were two variance hearings for Shore West on August 5th <br />and because of a conflict there could be no representative present, <br />one hearing had been withdrawn but they had failed to withdraw <br />this one. It was pointed out that there was a city cemetary be- <br />hind the property and this variance would not infringe on ahy other <br />property owner. Chairman Remmel pointed out that if the new owner <br />wants to enclose a natio he would have to get a variance, and it <br />could very possibly be denied. W. Wasniak moved to grant the v3ri- <br />ance, seconded by L. Horvath, and unanimously aporoved. Chairman <br />Remmel advised Mr. Bower to make sure that his building permits <br />were approved prior to star.ting construction. <br />The meeting was adjourned at 8:00 p.m. <br />C. Remmel, Chairman B. Oring, Re <br />ding Secretary