My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/25/2006 Minutes
Document-Host
>
City North Olmsted
>
Boards and Commissions
>
2006
>
2006 Planning and Design Commission
>
10/25/2006 Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 12:46:30 PM
Creation date
1/25/2019 4:32:41 AM
Metadata
Fields
Template:
N Olmsted Boards & Commissions
Year
2006
Board Name
Planning & Design Commission
Document Name
Minutes
Date
10/25/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
? •' • Lack of curbing along Whitethornto control water runoff <br />• Prefer asphalt shingles over metal roof for a more residential look <br />• Increased traffic on Whitethorn <br />• Construction vehicles parked on Whitethorn <br />Mr. Smith assured the residents that the stormwater would meet city requirements and the <br />construction vehicles would be parked in the leased parking lot. Mr. Lasko questioned if any <br />commissioner felt that the loading dock area was warranted. All commissioners agreed that a <br />loading dock was not warranted therefore they would not require a loading dock. <br />J. Lasko moved to table Third Federal Savings of 26949 Lorain Road which consists of site <br />improvements including demolition of existing bank and constructing a new bank with the <br />following recommendations: 1). New landscaping plans submitted which accurately reflect <br />the proposed landscaping. 2). Undulating 3-foot mounds are to be incorporated along <br />Whitethorn and the 3-foot black aluminum fence should be properly listed and reflected on <br />the plan. 3). The recommendations made by Mr. Malone are to be incorporated and <br />reflected on new landscape plan (i.e. eliminating the use of ash trees on the site, Blue and <br />Alberta.Spruce trees used the caliper of the trees). 4). Request_ a sample of the proposed <br />metal;?roof as well as an asphalt shingle. 5). Any and all sidewalks along both Lorain Road <br />andr,W,.hitethorn Blvd which need repair or replacing in fact be repaired or replaced. 6). <br />Brickscape along Lorain Road is to be reflected on new plans. 7). The radius of the drives <br />are f6<meet code requirements as well as stormwater and illumination requirements. 8). If <br />easU'di -ive is eliminated the 2 farthest east parking spaces are to be eliminated however the <br />commission is open to the possibility of two drives along Lorain Road as long as the eitst curb <br />cut isi an'-exit right turn only. 9). The enclosed dumpster is to be briek with vinyl type gates <br />and th,e colors are to match the proposed building colors. 10). The applicant is encouraged to <br />continue to move forward without requiring variances. R. Bohlmann secondedthe?qiiotion <br />whieh.Wasunanimously approved. Mr:1Vlahoney voiced that he did not believe that an illuminated wall sign was needed along the; ' <br />soutli as,it faces residential homes. Mrs. Meredith voiced that a variance would be required. i?f the <br />east curb cut is used due to a directional sign being installed. Mr. Lasko requested the applicants <br />show requested signage to scale on the new plans to be submitted. VI. COMMUNICATIONS: <br />J. L'ask'o`moved to excuse the absence of M. Yager. M. Meredith seconded the motion, which was <br />unanimously approved. <br />VII. ADJOtTRNMENT: <br />With-rio further business pending Chairman Lasko adjourned.the meeting at 10:15 pm <br />???,?1ooG <br />Jqlln J. Las&6, Jr., Chair <br />Date: <br />Donna Rote, Clerk of Commissions <br />5
The URL can be used to link to this page
Your browser does not support the video tag.