Laserfiche WebLink
Ms. Wenger said the project is co-locating on an existing T-Mobile tower behind Patton's <br />Towing. The tower would be extended to 190 feet, and an equipment structure installed within <br />the existing fenced area. Because it is a co-location, the proposal is considered an accessory use <br />under the WTFO District, and does not require a conditional use permit as did the original tower. <br />Mr. Mitchell said the drawing shows a duel flood light and he would like to see an exterior <br />shielded light used. He noted that two 5-ton HVAC units were being installed which could be <br />noisy. Mr. Rerko noted that he requested any generators on the site have shields to control noise <br />levels. Mr. O'Malley said the tower is required to be capable of extending to 200 feet therefore <br />the extension of the tower is appropriate. The review is basically the existing shelter and <br />equipinent issues within the shelter. <br />Mr. Gainar said the location of the tower was chosen to meet the needs of their clients as there is <br />currently a hole in the area signal. The 190 foot level would meet their needs for the antenna and <br />the self contained shelter will fit within the fenced enclosure without disrupting the landscaping. <br />They will use a shielded exterior light on the shelter as requested. The HVAC units will not run <br />siinultaneously; one baclcs the other up and will have a hum similar to a home unit. The HVAC <br />units are needed to lceep the equipment room cool. Mr. Rerlco said the HVAC compressors <br />would be the same as any retail unit on the market. Mr. Gainar said they would not be installing <br />a generator. He believed the noise levels would be about 80 decibels at the most. <br />Mr. Lasko moved, seconded by Mr. Bohlmann, to approve the proposal for COMS08-15: <br />AT&T Co-Location on existing tower at 29688 I,orain Road, conclitioned upon showang a <br />shielded light on the equipment shelter, wlaich was unanimously approved 7-0. <br />COMMUNICATIONS <br />OPC Cleveland Planning & Zoning Workshop <br />Ms. Wenger requested the commissioners indicate whether or not they would be attending the <br />worlcshop as soon as possible as seats were limited and depending on the number of PDC <br />members attending she would like to possibly invite BZA members. Mrs. Meredith asked if the <br />planner had recommendations for sessions they should attend. Ms. Wenger said she would leave <br />it open to the commissioners' interests. <br />ADJOURNMENT <br />The meeting was adj ourned at 9:10 pm. <br />J 1 J. Las , Jr., hair <br />? <br />/Donna Rot, Clerlc of Commissions <br />Approved: <br /> <br />4